Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />2.3.6 <br /> <br />additions to the contract drawings resulting from <br />OWNER'S review, and the conference. <br />(f) Furnish the OWNER three (3) copies of the final <br />contract drawings modified to concur with the 60% <br />complete conference at least thirty (30) days prior <br />to advertisement for bids of the individual items of <br />work for the OWNER'S review. <br />Furnish the OWNER fifteen (15) copies of final and approved <br /> <br />contract drawings and specifications. <br />2.3.7 Prepare a detailed statement of the ENGINEER'S opinion of <br />the construction costs based upon the final design developed for each <br />individual item of work authorized. The ENGINEER'S opinion of construc- <br />tion costs will be based on materials and labor prices prevailing at the <br />time of preparation. The ENGINEER will not be required to guarantee the <br />accuracy of the cost estimates. <br />2.3.8 Prepare a detailed statement of engineering costs as re- <br />lated to the total PROJECT. <br /> <br />2.4 PHASE 3 - ADMINISTRATION OF THE CONTRACT-CONSTRUCTION PHASE <br />Upon approval of the OWNER of the construction plans, specifi- <br />cations and contract documents, Phase 3 of this Agreement will commence; <br />and in accordance with the provisions of Article 7, p~ragraph 7.1.1, the <br />ENGINEER shall perform engineering services for Administration of the <br />Contract - Construction Phase as follows: <br />2.4.1 Assist the OWNER in the advertisements of the PROJECT for <br /> <br />bids. <br /> <br />-6- <br />