My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1977-037
San-Marcos
>
City Clerk
>
03 Resolutions
>
1970 s
>
1977
>
Res 1977-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2008 11:57:12 AM
Creation date
8/20/2008 11:57:12 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1977-37
Date
7/25/1977
Volume Book
47
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />2.3.6 <br /> <br />additions to the contract drawings resulting from <br />OWNER'S review, and the conference. <br />(f) Furnish the OWNER three (3) copies of the final <br />contract drawings modified to concur with the 60% <br />complete conference at least thirty (30) days prior <br />to advertisement for bids of the individual items of <br />work for the OWNER'S review. <br />Furnish the OWNER fifteen (15) copies of final and approved <br /> <br />contract drawings and specifications. <br />2.3.7 Prepare a detailed statement of the ENGINEER'S opinion of <br />the construction costs based upon the final design developed for each <br />individual item of work authorized. The ENGINEER'S opinion of construc- <br />tion costs will be based on materials and labor prices prevailing at the <br />time of preparation. The ENGINEER will not be required to guarantee the <br />accuracy of the cost estimates. <br />2.3.8 Prepare a detailed statement of engineering costs as re- <br />lated to the total PROJECT. <br /> <br />2.4 PHASE 3 - ADMINISTRATION OF THE CONTRACT-CONSTRUCTION PHASE <br />Upon approval of the OWNER of the construction plans, specifi- <br />cations and contract documents, Phase 3 of this Agreement will commence; <br />and in accordance with the provisions of Article 7, p~ragraph 7.1.1, the <br />ENGINEER shall perform engineering services for Administration of the <br />Contract - Construction Phase as follows: <br />2.4.1 Assist the OWNER in the advertisements of the PROJECT for <br /> <br />bids. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.