Laserfiche WebLink
-5- <br /> <br />Ce <br /> <br />De <br /> <br />After acceptance by City of the contract drawings and <br />Engineer's most recent opinion of probable Project <br />cost and upon written authorization to proceed, Engineer <br />shall proceed with performance of the services called <br />for in the Bidding Phase. This Phase shall terminate <br />and the services to be rendered thereunder shall be <br />considered cc~plete upon cc~nencement of the Construction <br />Phase. <br /> <br />The Construction Phase will co,~u~nce ~th execution of <br />the contract and will terminate upon written approval <br />by Engineer of final payment to the contractor(s). <br /> <br />FailUre of Engineer to n~et the time requirements in,posed <br />by sections A-D of this Article shall be grounds for <br />immediate termination of this agreement by City. <br /> <br />Be <br /> <br /> Vo <br />O~mpensation <br /> <br />The basic services described in Article II shall be paid <br />for on the basis of percentage of the cons%ruction cost <br />oft he project using~he curve shown as Attachment B, not <br />%o exceed 10% on projects of greater than $50,000 construc- <br />tion cost. The construction cost willbe %he lo~st reliable <br />acceptable bid. Basic service fees for projects under <br />$50,000 will be negotiated by the parties hereto. <br /> <br />1) <br /> <br />Upon deliveryof the preliminary design, the Engineer <br />shall be paid $12,900.00 for basic services plus all <br />cc~pensation due for additional services rendered and <br />reimbursable expenses incurred to that date. <br /> <br />2) <br /> <br />The pro-rataportion of the fee paid for the Prelim- <br />inaryPhase of the services willbe credited to those <br />improvements authorized to be taken through the final <br />design pb~se. <br /> <br />3) <br /> <br />Upon delivery of the final design, the Engineer shall <br />be paid an amount such that this amount plus the <br />previous payment for basic services shall total 70% of <br />the total compensation due for basic services, plus <br />all cc~pe_nsation due for additional services rendered <br />and reimbUrsable expenses incurred to that date. <br /> <br />4) <br /> <br />Upon award of t~ c~ntract, the Engineer shallbepaid <br />an amount such that this amount plus the previous pay- <br />ment for basic services shall total 85% of the total <br />conl3ensation due for basic services, plus all cc~pensa- <br />tion due for additional.services rendered and reimburs- <br />able expenses incurred to that date. <br /> <br />5) <br /> <br />During the construction phase, the Engineer may su~ait <br />monthly invoices based on .~he percentage 'of the <br />contractor's completion of the project and for addi- <br />tional services accc~plished during the billing period. <br />Upon comPletion of the construction phase, the <br />Engineer shall be paid the balance of the compensation <br />due for basic services plus all compensation due for <br />additional services rendered and reimbursable expenses <br />incurred to that date. <br /> <br />Payment for additional services described in Article III <br />shall be on a monthly basis as the work is performed and <br /> <br /> <br />