Laserfiche WebLink
1.1.8 Prepare preliminary engineering documents based on approved design development <br />information and any further adjustments authorized by the City in the scope, quality or budget of <br />the Project. <br />1.1.9 Use its best professional judgment to create preliminary engineering documents that <br />comply with applicable construction and development codes, local regulations and ordinances <br />and other federal and state regulations which are known or which should reasonably be known to <br />the Engineer including those required under the ADA and Article 9102, V.A.C.S., Architectural <br />Barriers Act. The Engineer will be responsible for notifying the City of requirements of the <br />Architectural Barriers Act and any other requirements by the Texas Department of Licensing and <br />Regulation <br />1.1.10 Ensure that no reports, maps, or other documents produced in whole or in part under this <br />Agreement will be the subject of an application for copyright by or on behalf of the Engineer. <br />1.2 TASK 2 - SURVEYING <br />The Engineer will: <br />1.2.1 Perform a topographic survey using the City's coordinate system and tie to City's <br />existing right-of-way plats and surveys to include: <br />a) Benchmarks at approximately every 1000' and sufficient horizontal control points <br />along the Project corridor for use as a construction baseline. In addition, the Engineer <br />will provide horizontal and vertical control based on on-site primary control provided <br />by the City; <br />b) Cross sections along existing drainage channels. The Engineer will take sections at <br />approximately every 100'. <br />c) Location, by actual on-the-ground survey visible and accessible on-grade and above- <br />grade storm drain structures including but not limited to culverts, storm drain outfalls, <br />headwalls, inlets and manholes; <br />d) Spot elevations at top of accessible storm drain manhole covers and provide invert <br />elevation of manhole, elevation of pipes entering or exiting manhole and flow line of <br />outfalls and culverts of accessible storm drain structures. The Engineer will provide <br />traffic control as necessary for the performance of this task. <br />e) Topographic survey of streets: <br />1) Location by actual on-the-ground survey visible and accessible on-grade and <br />above-grade features including but not limited to curbs, driveways, pavement <br />edges, traffic signs, sidewalks, ramps, fences, signs, walls, mailboxes, culverts, <br />storm drain outfalls, inlets, surface utility features and utility markers; <br />2) Cross sections along streets at approximately 50' intervals; <br />3) Spot elevations at top of accessible utility manhole covers and invert elevation of <br />manhole, elevation of pipes entering or exiting manhole of accessible sanitary <br />sewer and storm drain structures; <br />Bain Medina Bain - Victory Gardens Agseernent <br />3