Laserfiche WebLink
1.3.4 Assist the City in reviewing all bids, the Statement of Bidder's Qualifications, financial <br />statements of bidders, lists of bidders' proposed subcontractors, and all other documents required <br />to be submitted with the bids for responsiveness and for bid amount. Engineer will also verify <br />through reasonable investigation the financial and performance history documentation submitted <br />by the low bidder and second low bidder, and their references. The City will provide copies of <br />all of the bid documents to the Engineer within one day from the date of receipt of bids and the <br />Engineer will prepare a report of its review and evaluation, and include a written <br />recommendation for award of bid within ten calendar days of receipt of the bid documents of the <br />contract for construction, or other action as may be appropriate. The City will make the final <br />decision on the award of the construction contract and the acceptance or rejection of bids. The <br />Engineer will provide technical (but not legal) advice in bid protest situations. It is assumed that <br />this Project will be bid as one Project and at this time neither party anticipates that it will be <br />necessary to re-bid the Project. <br />1.3.5 Have no authority to issue a Notice to Proceed to any Contractor. <br />Construction Administration <br />1.3.6 Provide administration of the construction contract as set forth in the construction <br />documents unless otherwise provided in this Agreement and incorporated in the construction <br />contract documents. Engineer will not pursue a course of conduct which might jeopardize any of <br />the City's rights hereunder. Minor deviations from the construction contract documents that do <br />not affect the validity of performance bond(s) are permitted. <br />1.3.7 Be a representative but not an agent of the City during the construction phase, and advise <br />and consult with the City and provide progress reports and advice to the City in writing; forward <br />the City's instructions to the Contractor unless (1) Engineer is unavailable by telephonic <br />communication or otherwise to issue instructions necessary for the proper progress and <br />acceptance of work; (2) jeopardy to life and/or property exists; and/or (3) lack of instructions <br />and/or unavailability of Engineer will result in, in City's opinion, harm to City, in which case <br />instructions may be forwarded directly to the Contractor by the City; have authority to act on <br />behalf of the City only to the extent provided herein and in the construction contract documents <br />unless otherwise modified by written instrument in accordance with Section 12.1. Any <br />instructions issued directly by City to Contractor will be promptly communicated to the Engineer <br />if the Engineer was unavailable at the time of issuance of instructions. <br />1.3.8 Prepare, or cause to be prepared, and submit to the City a set of construction drawings <br />showing changes in the work due to addenda and clarifications made during the bidding phase. <br />The Engineer will submit these construction drawings in two full-size hard copy drawings, two <br />half-size drawings, as well as electronic copies in Pdf and CAD formats. The Engineer will also <br />provide the Contractor with up to three full-size sets and five half-size sets of construction <br />drawings, as requested, at no additional cost to the City. <br />1.3.9 Assist the City in conducting a pre-construction conference with the Contractor, members <br />of City's staff, representatives of affected utility providers, and federal and state agencies having <br />Bury P-rtners- akrdfrge Booster Pump Project <br />6