My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-120
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2010 11:44:55 AM
Creation date
8/31/2010 11:20:14 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Date
8/17/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.6.4 Provide the City with a final opinion of probable construction cost at the 100% plan <br />completion stage. <br />Biddin <br />1.6.5 Assist the City in the distribution of the bid documents to prospective bidders and the <br />issuance of addenda (if any) following the City's prior approval. <br />1.6.6 Assist the City in obtaining bids, tabulating bids, preparing bid tabulation forms, and in <br />awarding the contract for construction following the City's approval of the construction contract <br />documents and of the latest detailed final cost estimate of the Project. <br />1.6.7 Assist the City in conducting the pre -bid conference with potential bidders. During the <br />pre --bid conference, the Consultant will describe the scope of work; answer pertinent questions of <br />potential bidders and City staff, address requests for additional information and make all <br />necessary clarifications and interpretations of the construction contract documents. <br />1.6.8 Assist the City in reviewing all bids, the Statement of Bidder's Qualifications, financial <br />statements of bidders, lists of bidders' proposed subcontractors, and all other documents required <br />to be submitted with the bids for responsiveness and for bid amount. Consultant will also verify <br />through reasonable investigation the financial and performance history documentation submitted <br />by the low bidder and second low bidder, and their references. The City will provide copies of <br />all of the bid documents to the Consultant within one day from the date of receipt of bids. <br />Within seven (7) calendar days of receiving the bid documents from the City, the Consultant will <br />prepare a report of its review and evaluation, and include a written recommendation for award of <br />the contract for construction, or other action as may be appropriate. The City will make the final <br />decision on the award of the construction contract and the acceptance or rejection of bids. The <br />Consultant will provide technical (but not legal) advice in bid protest situations. Both the City <br />and the Consultant assume that this Project will be bid as one Project and neither party <br />anticipates that it will be necessary to rebid the Proj ect. <br />1.6.9 Have no authority to issue a Notice to Proceed to any Contractor. <br />1.6. 10 Provide the City with two half size and two full size sets of conformed construction <br />plans. Provide the Contractor with three half size and two full size sets of conformed <br />construction plans at no additional cost to the City. <br />Construction Administration <br />1.6.11 Administer the construction contract as set forth in the construction documents unless <br />otherwise provided in this Agreement and incorporated in the construction contract documents. <br />The Consultant will not pursue a course of conduct, which may jeopardize any of the City's <br />rights hereunder. Minor deviations from the construction contract documents that do not affect <br />the validity of performance bond(s) are permitted. <br />Luck Design -- Gary sports Complex Improvements — Phase I Project Agreement <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.