My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-155
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2010 1:23:06 PM
Creation date
11/1/2010 11:36:13 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2010-155
Date
10/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.12 TASK 12 — ENGINEERING DATA ANALYSIS, RECOMMENDED <br />REHABILITATION SUMMARIES AND COST ESTIMATES <br />The Consultant will: <br />1.12.1 Evaluate and analyze the data collected, review videotapes of the television inspection, <br />and present the results in the form of a report. The report shall include the following items: <br />a) A List of all public and private deficiencies identified during the field investigation <br />tasks. The following will be listed for each deficiency: <br />1) Identified Infiltration/Inflow Quantities; <br />2) Recommended Rehabilitation Method; and <br />3) Estimated Rehabilitation Cost. <br />b) An evaluation of identified system deficiencies and rehabilitation recommendations. <br />c) An analysis of available rehabilitation methods, including but not limited to the <br />following: <br />1) Main replacement; <br />2) Point repair (including re- setting castings on manholes and cleanouts); <br />3) Chemical grouting of joints; <br />4) Trenchless Technology (destructive and non - destructive methods); <br />5) Manhole rehabilitation; <br />6) Manhole replacement; <br />7) Relief main construction; and <br />8) Re- routing sewage flows. <br />d) Graphical summaries of recommended system rehabilitation. <br />e) A detailed cost estimate for the recommended rehabilitation/replacement plan. <br />1. 12.2 Note all system defects by referencing existing City manhole numbers. The Consultant <br />will base its rehabilitation recommendations on constructability, cost, and effect on overall <br />system performance. The Consultant will segregate maintenance related improvements and <br />Capital Improvement Program recommendations and will prioritize all recommendations for <br />rehabilitation based on the goals of the overall Project. <br />1. 12.3 Provide a written report detailing the methods used to determine the recommended <br />system rehabilitation; listings of defects; digital photographs of the noted system defects; <br />construction cost estimates; and quantity of inflow /infiltration removed by the recommended <br />improvements for City review. In addition, the Consultant will provide five (5) copies, as well <br />as five (5) digital copies in Word and PDF, of the Engineering Data Analyses Report to the City <br />for review and comment. <br />1.13 TASK 13 — DRAFT REPORT <br />The Consultant will: <br />Burgess and Niple, Inc. Engineering Services Agreement <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.