My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-156 (Tabled)
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-156 (Tabled)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2011 10:08:51 AM
Creation date
12/29/2010 10:18:35 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Date
10/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.4.5 Utilitv Trackine Report. Create, provide and maintain a Utility Tracking Report <br />spreadsheet, in Excel format, containing at a minimum the following information: <br />1) Name of Utility; <br />2) Contact Name /Address/Phone/E -Mail; <br />3) Type of Facility; <br />4) Utility Notification Date and Type; <br />5) Last Date of Contact; <br />6) Within ROW or Private Easement; <br />7) Eligible for Reimbursement; <br />8) Possible Conflict; <br />9) Potential Conflict Location Data Information; <br />10) Preliminary Relocation Cost; <br />11) Utility Agreement Process; <br />12) Date sent to Owner; <br />13) Date Received back from Owner; <br />14) Agreement Executed; <br />15) Utility Relocation; <br />16) ROW Acquired; <br />17) Construction Start Date; <br />18) Construction Complete Date; <br />19) ROW Cleared; and <br />20) Comments Section. <br />1.4.6 Preliminary Design Packaee <br />1) Prepare Certified Return Receipt Notification Packages for identified utility <br />companies. <br />2) Prepare notification Letters on TxDOT letterhead (template provided by TxDOT) <br />signed by the TxDOT ROW Administrator notifying each utility company of the <br />Project, listing the limits of the Project, estimated construction cost, letting date and <br />date and time of the Preliminary Design Meeting to be held at the TxDOT Austin <br />District or Area Office. The Engineer will request from utility companies, the <br />provision of utility block maps, record drawings, as- builts and any other information <br />the companies may have pertaining to their existing facilities within the Project <br />limits. This meeting follows the Utility Cooperative Management Process, (Process <br />Activity IIl) and will serve as the Utility Kick -Off Meeting. <br />1.4.7 Utilitv Assemblv Packages. <br />1) Determine which utilities will conflict with highway construction or the TxDOT <br />"Utility Accommodation Rules" (UAR). Assist utility companies in the preparation <br />of required agreements associated with the funding of adjustments and the occupation <br />of state ROW. <br />HDR — Loop 82 Project Agreement <br />13 <br />