My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-078
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2011 4:17:55 PM
Creation date
7/1/2011 10:53:08 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Date
6/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Construct two new primary underground electric feeders capable of <br />providing two 800 Amp capacity primary service in Hutchinson St. <br />and North LBJ with an underground electric vault at a location <br />mutually acceptable to Texas State and the City proximate to the <br />Texas State proposed South Chill Plant. <br />3. Remove overhead electric service and relocate said service and <br />infrastructure components per City's design to an underground <br />location determined by the City. <br />4. Remove poles from the north side of University Drive between C.M. <br />Allen Parkway and N. LBJ Drive. <br />b. Temporary Transformers. Texas State does not anticipate temporary <br />transformers will be necessary for its project. However, if temporary <br />transformers become necessary, Texas State will purchase and pay <br />for the cost of any temporary transformers necessary to provide <br />temporary power for the CPACI project and will calculate and submit <br />temporary load calculations to City on or before July 1, 2011. City will <br />review necessary loads, determine any load reallocation to the City's <br />system and optimal locations to provide temporary service necessary <br />for the CPACI project. City will not be responsible for any delays in <br />transformer delivery and Texas State understands that significant <br />delay times for delivery are possible. <br />c. City agrees to provide temporary electric service with power capacity <br />of 2.0 MVA to the Texas State South Chill Plant on or before milestone <br />4 provided Section 3.02 b deadlines and requirements are met. <br />Temporary power will be billed at the Texas State University rate class <br />(Texas State rate schedule in City of San Marcos, Electric Utility Rate <br />Schedule booklet) in effect at the time the power is provided to the <br />South Chill Plant delivery site. <br />3.03 Cost Estimates and Payment. <br />a. Cost Estimates. Texas State will pay the City for actual costs directly <br />associated with the DEUP underground work generally described in <br />Sections 3.02(a) 3 -4 and 3.02b and 3.09 and detailed in the Engineers <br />Project Cost Estimate attached hereto as Exhibit B and incorporated <br />herein. <br />b. Payment. Payment is due from Texas State for the underground portion <br />of the DEUP in detailed Exhibit B prior to the City's bid award which is <br />estimated to occur on or before March 20, 2012. The bid tabulation for <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.