My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-092
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:10:58 AM
Creation date
8/8/2011 3:46:59 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2011-92
Date
8/2/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
391 CONTRACT TO THE CITY OF SAN MARCOS - QT- 2901/3 <br />12. Data Conversion <br />12.1 Description <br />Data conversion services are included as part of this contract. A sample of Customer's data output has been <br />provided along with specifications of tables to be included in the conversion. If additional tables or data sets <br />are required, a modified cost proposal will be required. <br />12.2 Assumptions and Constraints <br />a) This project includes two (2) mock conversions and one final conversion, consisting of the source data <br />provided to New Dawn Technologies. Additional mock iterations can be added at an additional cost and <br />would require time be added to lengthen the project timeline. <br />b) New Dawn will provide the code tables populated with Customer data prior to Go -Live to support the data <br />mapping and conversion. <br />c) A project schedule will be developed and mutually agreed to during the initiation of this project. A delay in <br />the delivery of milestones or related sub -steps which are the responsibility of the Customer will result in a <br />day- for -day delay in subsequent milestones that New Dawn is responsible for. <br />d) No image or document conversion is included in the scope of this Statement of Work. <br />e) Following a New Dawn deliverable, unless otherwise specified, the Customer has 20 business days to <br />report any issues from date deliverable was provided. If New Dawn receives no response within that time, <br />the deliverable will be considered accepted as delivered. <br />f) New Dawn will not be responsible for modifying or deleting duplicate records of legacy data with in- service <br />data. <br />g) Data Conversion work performed under this SOW is under warranty by New Dawn for thirty (3o) days <br />following 90 day post go live trip. Errors or omissions in converted data that result from application, <br />database, or source data changes by the Customer following acceptance of the Table Mapping Document <br />are not covered by this warranty. <br />12.3 Estimated Key project milestones <br />�� VLNewDawn <br />
The URL can be used to link to this page
Your browser does not support the video tag.