My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2001-218
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2001
>
Res 2001-218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2006 8:50:27 AM
Creation date
7/11/2006 8:49:57 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2001-218
Date
12/17/2001
Volume Book
145
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the construction contract documents upon substantial completion, subject to the results of <br />any subsequent tests required by or performed under the construction contract documents, <br />subject to minor variations from the construction contract documents correctable prior to <br />completion, and subject to any specific qualifications stated in the Certificate for Payment); <br />and that the Contractor is entitled to payment in the amount certified. However, the <br />issuance of a Certificate for Payment will not be a representation that the Consultant has <br />made any examination to ascertain how and for what purpose the Contractor has used the <br />monies paid by the City. <br /> <br />1.4.16 Have authority to reject work which does not conform to the construction contract <br />documents. Whenever, in the Consultant's reasonable opinion, it is necessary or <br />advisable for the proper implementation of the intent of the construction contract <br />documents, and with the approval of the City, the Consultant will have authority to require <br />special inspection or testing of the work in accordance with the provisions of the <br />construction contract documents, whether or not such work is then fabricated, installed or <br />completed. The Consultant will review the work and results of all testing laboratories as <br />required by the construction contract documents. <br /> <br />1.4.17 Review and make all decisions regarding the approval or taking of other appropriate <br />action upon the Contractor's submittals, including but not limited to, shop drawings, product <br />data and samples, schedule of values and progress schedule. Such action will be taken <br />with reasonable promptness, but generally not to exceed 15 days. The Consultant's <br />acceptance of a specific item will not indicate acceptance of an assembly of which the item <br />is a component. The Consultant will maintain a record of submittals and copies of <br />submittals supplied by the Contractor. <br /> <br />1.4.18 Prepare minor changes in the plans and specifications as directed by the City; and <br />prepare necessary change orders in triplicate originals for approval by the City and <br />execution in accordance with the construction contract documents. Consultant will not <br />issue change orders not previously approved in writing by City, and no course of conduct <br />on the part of Consultant or City will amend, waive or alter this provision. The Consultant <br />will be compensated for Change Orders researched, prepared and issued required through <br />no fault of the Consultant as an additional service. <br /> <br />1.4.19 Maintain records relative to changes in the work. <br /> <br />1.4.20 Conduct professional inspections to determine the dates of substantial completion <br />and final completion for the Project, to evaluate the work for acceptable conformance with <br />the construction contract documents and in light of any subsequent tests performed as <br />described in Subsection 1.4.15 to verify that any minor deviations from the construction <br />contract documents as described in Subsection 1.4.15 have been corrected and that the <br />reasons for any specific qualifications in any and all previous certificates for payment as <br />described in Subsection 1.4.15 hereof are either no longer valid or the condition(s) and/or <br />problem(s) have been corrected; shall receive and review written warranties and related <br />documents required by the construction contract documents and assembled by the <br /> <br />voelzel agrmnt revised.wpd <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.