Laserfiche WebLink
<br />that the work has progressed to the pomt mdIcated, that, to the best of the Engmeer's <br />knowledge, mformatIOn and behef, the quahty of the work IS m acceptable conformance <br />wIth the constructIOn contract documents (subject to an evaluatIon of the work for <br />conformance WIth the constructIOn contract documents upon substantIal completIOn, <br />subject to the results of any subsequent tests reqUIred by or performed under the <br />constructIon contract documents, subject to mmor vanatIOns from the constructIon <br />contract documents correctable pnor to completIon, and subject to any speCIfic <br />quahficatIOns stated m the CertIficate for Payment), and that the Contractor IS entItled to <br />payment m the amount certIfied. However, the Issuance of a CertIficate for Payment wIll <br />not be a representatIon that the Engmeer has made any exammatIOn to ascertam how and <br />for what purpose the Contractor has used the momes paId by the CIty <br /> <br />1 15 17 Have authonty to reject work WhICh does not conform to the constructIOn <br />contract documents. Whenever, m the Engmeer's reasonable opmIOn, It IS necessary or <br />adVIsable for the proper ImplementatIOn of the mtent of the constructIOn contract <br />documents, and WIth the approval of the CIty, the Engmeer WIll have authonty to reqUIre <br />specIal mspectIOn or testmg of the work m accordance WIth the provIsIOns of the <br />constructIon contract documents, whether or not such work IS then fabncated, mstalled or <br />completed. The Engmeer WIll reVIew the work and results of all testmg laboratones as <br />reqUIred by the constructIOn contract documents. Whenever the Contractor notIfies the <br />Engmeer or the CIty of subsurface or phYSIcal condItIons at the Project SIte for WhICh <br />such notIficatIOn IS reqUIred by the constructIOn contract, the Engmeer wIll adVIse the <br />CIty and mspect the condItIOns at the SIte The Engmeer WIll adVIse the CIty as to the <br />appropnate actIOn(s), and WIll aSSIst the CIty m respondmg to the Contractor <br />Engmeenng and technIcal servIces that are reqUIred to mvestIgate the subsurface or <br />physIcal condItIOns WIll be conSIdered AddItIOnal ServIces The Engmeer and the CIty <br />agree that as part of the Engmeer's BaSIC ServIces, the Engmeer wIll complete five <br />specIalty mspectIOns and perform testmg servIces for the new odor control facIhtIes, <br />electncal Improvements, SCADA (I&C) mstallatIOn and mechamcal mstallatIOns. The <br />Engmeer wIll perform the agreed specIalty mspectIOns and testmg m accordance WIth the <br />constructIOn contract documents <br /> <br />1 15 18 Obtam from the Contractor a proposed shop drawmg and submIttal schedule, <br />whIch WIll IdentIfy all shop drawmgs, samples and submIttals reqUIred by the <br />constructIOn contract, along WIth the antICIpated dates for submIssIOn. The Engmeer wIll <br />coordmate WIth the deSIgn team for the reVIews of the Contractor's shop drawmgs, <br />samples, and other submIttals. The Engmeer WIll log and track all shop drawmgs, <br />samples and submIttals. Such actIOn wIll be taken WIth reasonable promptness, but <br />generally not to exceed 15 days or such penod of tIme as WIll not cause delay of the <br />ProJect. It IS assumed that 140 submIttals and 60 re-submIttals WIll be made by the <br />Contractor The Engmeer and deSIgn team's reVIew of all shop drawmgs, samples and <br />submIttals WIll be for general conformance WIth the deSIgn concept and general <br />comphance WIth the reqUIrements of the constructIOn contract. Such reVIew wIll not <br />reheve the Contractor from ItS responsibIhty for performance m accordance WIth the <br />constructIOn contract, nor IS such reVIew a guarantee that the work covered by the shop <br />drawmgs, samples and submIttals IS free of errors, mconsIstencIes or omISSIOns. The <br /> <br />6 <br /> <br />CH2M Hill WWTP Amdmt 1 1-18-05 (4) <br />