<br />Engmeer's scope wIll be based upon the scope of work m the constructIOn contract and <br />wIll mclude a maXImum of two submIsSIOns by the Contractor for each shop drawmg, <br />sample or submISSIOn. Should there be addItIonal reVIews reqUIred of the Engmeer and <br />deSIgn team, the reVIews WIll be treated as addItIonal servIces. <br /> <br />1 15 19 ReVIew the Contractor's constructIOn schedule and venfy that It IS conSIstent <br />WIth the reqUIrements of the constructIOn contract. The Engmeer WIll adVIse the <br />Contractor of any areas where the schedule IS not m complIance With the constructIOn <br />contract, and WIll proVIde comments to the CIty to aSSIst It m approvmg, acceptmg or <br />takmg other actIOn on the Contractor's schedule, m accordance WIth the constructIOn <br />contract. The Engmeer's reVIew and comments Will not be consIdered as a guarantee or <br />confirmatIOn that the Contractor WIll complete the work m accordance WIth the <br />constructIOn contract. The Engmeer WIll reVIew the Contractor's penodIc schedule <br />updates or other schedule submISSIons. The Engmeer WIll adVIse the Contractor If the <br />updates or other submISSIOns are not m accordance WIth the constructIon contract. The <br />Engmeer WIll provIde comments to the CIty regardmg the updates or other submISSIOns, <br />as well as monthly reports to the CIty as to the status of the constructIOn schedule, date of <br />completIOn, contract pnce, retamage, pendmg changes to the contract pnce or completIOn <br />date, and other Issues matenal to the cost and tIme for completIOn of the constructIOn. <br /> <br />1 15.20 Prepare mmor changes m the plans and specIficatIOns as dIrected by the CIty; and <br />prepare necessary change orders m tnplIcate ongmals for approval by the CIty and <br />executIOn m accordance With the constructIOn contract documents The Engmeer wIll <br />review mformatIon submItted by the Contractor regardmg the effect of proposed or Issued <br />change orders upon the constructIOn schedule, duratIOn and completIOn date and wIll <br />obtam other mformatIOn as IS necessary to evaluate the baSIS for the Contractor's <br />proposal. The Engmeer wIll aSSIst the CIty WIth any negotIatIOns of change orders, and <br />will adVIse the CIty as to the potentIal Impact of proposed or Issued change orders. The <br />Engmeer wIll aSSIst the CIty m dISCUSSIOns WIth the Contractor concernmg the potentIal <br />Impact of proposed or Issued change orders. The Engmeer WIll not Issue change orders <br />not preVIOusly approved m wntmg by CIty, and no course of conduct on the part of the <br />Engmeer or the CIty WIll amend, WaIve or alter thiS proVISIOn. The Engmeer WIll prOVIde <br />penodIc reports to the CIty about the status of change orders. These reports wIll mclude <br />Issued change orders, pendmg change orders, and change order amounts <br /> <br />1 15.21 Conduct profeSSIOnal mspectIOns to determme the dates of substantIal completIOn <br />and final completIOn for the ProJect, to evaluate the work for acceptable conformance <br />WIth the constructIOn contract documents and m lIght of any subsequent tests performed <br />as described m SubsectIOn 1 15 16 to venfy that any mmor deVIatIOns from the <br />constructIOn contract documents as described m SubsectIOn 1 15 16 have been corrected <br />and that the reasons for any speCific qualIficatIOns m any and all prevIOUS certIficates for <br />payment as described m SubsectIOn 1 15 16 hereof are eIther no longer valId or the <br />condItIon(s) and/or problem(s) have been corrected, WIll receIve and reVIew wntten <br />warrantIes and related documents reqUIred by the constructIOn contract documents and <br />assembled by the Contractor; WIll Issue final certIficates for payment or take other <br /> <br />7 <br /> <br />CH2M Hill WWTP Amdmt 1 1-18-05 (4) <br />