Laserfiche WebLink
<br />CITY OF SAN MARCOS <br />January 20, 2000 <br />Page 3 <br /> <br />additional fee evaluation is based on the Texas Society of Professional Engineers (TSPE) <br />fee basis. The second evaluation is the actual manpower to date plus remaining services. <br />Attachment B provides the TSPE summary output for the basic professional engineering <br />fees, and based on the current total project construction cost estimate of$I,150,598. This <br />total fee of $141 ,984 represents services for the preliminary engineering, final design and <br />construction plans, permitting, bidding assistance and construction observation phases. <br /> <br />For comparison purposes, Attachment C provides a similar,TSPE fee basis output <br />summary for the previous project construction cost estimate of $605,000. This basic <br />services fee is $79,618. Therefore, an increase in total engineering fees of$62,366 could <br />result. However, based on our analysis presented below, we are requesting a lower fee <br />adjustment. <br /> <br />Our Pre-Design Report does include some recommended cost saving, or "value <br />engineering", measures. Consequently, we anticipate that the final total project <br />construction cost estimate will not exceed $1,000,000. Therefore, Attachment D would <br />be used for the remaining TSPE basic services professional fees beyond the preliminary <br />engineering phase. <br /> <br />The following table summarizes the current total fees, the requested total fees, and the fee <br />increases, by phase of services. <br /> <br />TABLE 1. <br /> <br />Phase <br />Preliminary Engineering <br />Final Design <br />Bid Assistance <br />Construction <br />Reimbursables <br /> <br />Current <br />Total Fee <br />$60,8201 <br />16,620 <br />3,690 <br />9,170 <br />3,000 <br />$93,300 <br /> <br />Requested <br />Total Fee <br />$93,7562,4 <br />22,2853 <br />4,9483 <br />12,2953 <br />3.000 <br />$136,284 <br /> <br />Fee Increase <br />$32,936 <br />5,665 <br />1,258 <br />3,125 <br />o <br />$42,984 <br /> <br />IIncludes $4,450 for geotechnical investigation subconsultant and $15,250 for design surveys, of which <br />design surveys are not included in the TSPE basic services fees (Attachment C). Fee shown includes <br />previous Additional Services Authorization Nos. 1 and 2 only, and does not include Authorization No.3. <br />2Based on Attachment B. Proposed fee = $141,984 x $60,820/$93,300 = $92,556. <br />3Based on Attachment 0, and prorated from current fees. <br />4Includes previous City-authorized additional geotechnical investigation fee of $1 ,200. <br /> <br />As indicated, this fee evaluation method reflects a total professional services fee increase <br />of$42,984. Out of this total, the preliminary engineering fee would increase by $32,936. <br />