My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-190
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2006 2:59:06 PM
Creation date
7/21/2006 2:58:36 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2005-190
Date
12/14/2005
Volume Book
164
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />documents. <br /> <br />I 1 4 5 Have no authonty to Issue a NotJce to Proceed to any Contractor <br /> <br />ConstructIon AdmIlllstratIOn <br /> <br />1 4 6 PrOVIde admmIstratIon of the constructIOn contract as set forth m the constructIon <br />documents unless otherwIse proVIded m thIS Agreement and mcorporated m the constructIOn <br />contract documents. Engmeer wIll not pursue a course of conduct WhICh mIght JeopardIze any of <br />the City's nghts hereunder Mmor deVIatIOns from the constructIOn contract documents that do <br />not affect the valIdIty of performance bond(s) are permItted. <br /> <br />1 4 7 Be a representatIve but not an agent of the City dunng the constructIon phase, and adVIse <br />and consult WIth the CIty and prOVIde progress reports and adVIce to the CIty m wntmg; forward <br />the CIty'S mstructIons to the Contractor unless (1) Engmeer IS unaVailable by telepholllc <br />commUlllcatIOn or otherwIse to Issue mstructIOns necessary for the proper progress and <br />acceptance of work; (2) Jeopardy to lIfe and/or property eXIsts, and/or (3) lack of mstructIons <br />and/or unaVailabIlIty of Engmeer WIll result m, m City's opmIOn, harm to CIty, m whIch case <br />mstructIOns may be forwarded dIrectly to the Contractor by the CIty; have authonty to act on <br />behalf of the CIty only to the extent prOVIded herem and m the constructIOn contract documents <br />unless otherwIse modIfied by wntten mstrument m accordance WIth SectIOn 12 1 Any <br />mstructIons Issued dIrectly by CIty to Contractor wIll be promptly commulllcated to the Engmeer <br />If the Engmeer was unaVailable at the tIme of Issuance of mstructIOns. <br /> <br />I <br /> <br />1 4 8 ASSISt the City m conductmg a pre-constructIon conference WIth the Contractor, members <br />of CIty'S staff, representatIves of affected utIlIty prOVIders, and federal and state agenCIes havmg <br />JunsdIctIOn over the ProJect (mcludmg City mspectors) m order to establIsh constructIon <br />schedules and to IdentIfy key representatIves of the partIes and lInes of commUlllcatIOn. <br /> <br />1 4 9 ASSISt the City m ensunng that all applIcable permIts and approvals have been obtamed <br />from the appropnate agenCIes pnor to constructIOn. <br /> <br />1 4 10 Make on-SIte mspectIOns of the Project at least twIce monthly to ensure famIlIanty WIth <br />the progress and qualIty of the work, to determme If the work IS proceedmg m acceptable <br />conformance WIth the constructIon contract documents, and to reVIew the work WIth the City's <br />deSIgnated representatIves. On the baSIS of such on-SIte mspectIOns by the Engmeer, the <br />Engmeer WIll keep the City mformed of the progress and qualIty of the work through wntten <br />status reports and through meetmgs WIth the CIty'S representatIve, and WIll also be reasonably <br />avaIlable to perform SIte VISItatIOns at the speCIfic request of the CIty by the next busmess day <br />after a request IS made <br /> <br />I <br /> <br />1 4 11 Not have control or charge of and WIll not be responsible for constructIon means, <br />methods, technIques, sequences or procedures, or for safety precautIOns and programs m <br />connectIon WIth the work, for the acts or omISSIOns of the Contractor, subcontractors or any other <br />persons performmg any of the work, or for the faIlure of any of them to carry out the work m <br />accordance WIth the constructIOn contract documents unless such acts or omISSIOns are due to the <br /> <br />APAI Surface Water Expansion <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.