My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-138
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 4:41:22 PM
Creation date
11/28/2011 1:36:13 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2011-138
Date
11/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Cultural Resources - Archeological Studies: If impacts are expected on new location or <br />previously undisturbed portions of the project area, it is assumed that an archaeological <br />survey would be required. <br />• Noise Analysis: Assuming traffic moves one travel lane closer to sensitive receivers, <br />then in accordance with TxDOT noise assessment guidelines, the roadway alignment for <br />the design year will be computer simulated, and future noise levels will be predicted at <br />each of the sensitive receptors using the FHWA/TxDOT approved Traffic Noise Model <br />(TNM). <br />• Ecological Investigations — Water Resources: A more detailed analysis of impacts to <br />waters of the U.S. and wetlands would be required if more impacts are anticipated. <br />Direct coordination with USACE is not included. <br />• Ecological Investigations — Biological Resources: A more detailed analysis of <br />biological resources would be required if more impacts are anticipated. Section 7 <br />consultation with USFWS is not included. <br />• Recreational Resources: A more detailed analysis of recreational resources (hike and <br />bike trails, parks) would be required if more impacts are anticipated. Preparation of a <br />Section 4(f) or 6(f) analysis is not included. <br />• Indirect and Cumulative Impact Studies: A more detailed analysis of indirect and <br />cumulative impacts would be required if the project adds capacity or is expected to <br />induce development, and would be included in the CE according to TxDOT's 2010 <br />guidance. <br />1.4B.2 Document Preparation and Review: For a CE, The Engineer would prepare the draft <br />document and submit to the City and TxDOT Austin District for review. Comments /responses <br />would cycle through the District, TxDOT ENV, agencies, and FHWA. FHWA provides review <br />and approval. <br />1.4C.1 Preparation of Environmental Assessment (EA) document: <br />If the proposed project adds capacity and requires right -of -way acquisition and environmental <br />impacts may be substantial, the Engineer will prepare an Environmental Assessment (EA). <br />Services would include those listed for a PCE and CE as described above, plus the following: <br />• Ecological Investigations — Water Resources: For an EA for this specific project, it is <br />assumed that Pre - construction Notification to USACE would be required under an NWP <br />#14, but a regional or individual permit is not included. <br />• Ecological Investigations — Biological Resources: A more detailed analysis of <br />biological resources would be required if more impacts are anticipated. Additional <br />informal coordination with USFWS is anticipated. Formal Section 7 consultation <br />(preparation of a Biological Assessment) with USFWS is not included. <br />• Recreational Resources: A more detailed analysis of recreational resources (hike and <br />bike trails, parks) would be required if more impacts are anticipated. Preparation of a <br />Section 4(f) or 6(f) analysis is not included (but additional effort will be invested to avoid <br />direct impacts to 4(f) or 6(f) resources). <br />Kimley -Hom — FM 2439 (Hunter Road) <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.