My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-138
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 4:41:22 PM
Creation date
11/28/2011 1:36:13 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2011-138
Date
11/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.10.9 Incorporate TxDOT standard bridge details for rails, standard beam details, and other <br />miscellaneous bridge construction. <br />1.10.10 Prepare the following deliverables (in addition to deliverables identified in Task 9): <br />a) Bridge Layout submission to TxDOT Bridge Division at 30% including Bridge <br />Layout, Typical Sections, Hydraulic Data Sheets, and Plan- Profile sheets. <br />1.11 TASK 11— FINAL TRAFFIC ENGINEERING <br />1.11.1 Prepare Signing and Pavement Marking sheets at a scale of 1 " =40'. Design signing and <br />pavement markings in accordance with the Texas Manual for Uniform Traffic Control Devices. <br />Include signage identifying the bike route within the corridor. <br />1. 11.2 Develop small sign summaries and sign details for non - standard traffic signs. <br />1.11.3 Prepare traffic signal design modifications for the existing traffic signal at Hunter Road <br />and Bishop Street <br />a) It is anticipated that the existing signal poles will be relocated due to widening of <br />Hunter Road. The Engineer will develop plans for installing new signal poles with <br />appropriate mast arm lengths, signal heads, ADA compliant pedestrian signal heads, <br />push- buttons, and ramps, conduits, wiring, cameras for vehicle detection, and <br />illumination at the intersection. Existing signal cabinet will be inspected in the field to <br />determine if it can be reused for the new signal. Any existing signal infrastructure that is <br />not being reused will be salvaged back to the City. All existing communication <br />equipment including radio and antenna will be reused at the new signal. <br />b) The Engineer will determine appropriate sequence and phasing of construction to <br />maintain signal operation at all times. The Engineer will prepare the following sheets as <br />part of signal modifications plan set: <br />• General notes associated with signal modifications; <br />• Proposed signal layout; <br />• Signal elevation; <br />• Electrical wiring and conduit charts; <br />• Phasing and street name sign; <br />• Existing conditions; <br />• Quantity summaries. <br />1.11.4 Design Continuous Roadway Illumination <br />a) The Engineer will develop illumination plans for continuous lighting on both sides of <br />the road along the entire stretch of the project corridor. The Engineer will utilize <br />luminaires as selected to blend with the corridor aesthetic scheme and develop a <br />photometric model using lighting software AGi 32 to determine that minimum <br />"Illuminance" requirements are satisfied. The Engineer will conduct electrical and <br />Kimley Hom — FM 2439 (Hunter Road) <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.