My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2000-224
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2000
>
Res 2000-224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2006 3:34:54 PM
Creation date
7/24/2006 3:34:31 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2000-224
Date
11/13/2000
Volume Book
142
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.2.7 Provide a Technical Memorandum summarizing background research and field <br />investigation including: <br /> <br />(a) Background and field assessment of wetlands and other jurisdictional waters. <br />(b) Endangered/threatened species record information reconnaissance and <br />written coordination with the US Fish and Wildlife Service and the Texas <br />Parks and Wildlife Department regarding compliance with the federal <br />Endangered Species Act. <br />(c) Cultural/archaeological resources background reconnaissance and initial <br />Texas Historical Commission coordination services to obtain their <br />recommendations regarding project clearance. <br /> <br />1.3 PHASE 3 - FINAL DESIGN AND BIDDING <br /> <br />The Engineer will: <br /> <br />1.3.1 Prepare final plans including: <br /> <br />(a) Roadway plan/profile sheets. <br />(b) A drainage plan and calculations. Storm sewer design is not anticipated or <br />included. <br />(c) Cross drainage plan/profile sheets. <br />(d) Storm water pollution prevention plan (SW3P). <br />(e) Traffic control plan. <br />(f) Striping plan. <br />(g) All required standard detail sheets. <br /> <br />1.3.2 Acquire TxDOT permit as required for construction. <br /> <br />1.3.3 Prepare any special details required for the Project. <br /> <br />1.3.4 Prepare box culvert plan and profile for two cross drainage structures. Bridge <br />structure design is not included in this agreement. <br /> <br />1.3.5 Prepare three sets of review plans for City comment at 60% and 90% completion. <br />At 90% completion, technical specifications and the bid form will be included for review. <br /> <br />1.3.6 Incorporate final review comments into design. <br /> <br />1.3.7 Prepare final quantities and cost estimate. <br /> <br />1.3.8 Prepare construction contract documents using forms supplied by the City based <br />on the approved design development documents and any further adjustments authorized <br />by the City in the scope, quality or budget of the Project. These contract documents will <br />include detailed plans and technical specifications required for the Project to be accurately <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.