My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2011-061
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2011
>
Ord 2011-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2017 12:54:38 PM
Creation date
12/16/2011 10:18:41 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Approving
Number
2011-61
Date
12/6/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Throughout the Subdivision Restrictive Covenants, the Architectural Control Committee (ACC) <br />is referenced as having jurisdictional control and authority over any lot development. This PDD <br />allows the City to have equal jurisdictional control and authority for any development aspects not <br />mentioned in this PDD. For development aspects contained in this PDD, the ACC shall review <br />and approve such aspect first before submittal to the City for approval. <br />IV, Subdivision Re-Plat <br />After re-zoning and PDD approval, the existing Lot 1, Block C of this subdivision will be re- <br />platted into two (2) lots. This 13.0 acre tract would be Lot 3, Block C. The balance of the <br />original Lot I will be re-platted as Lot 1 -A, Block C. Per the subdivision plat of record, Lot 2, <br />Block C is the parkland dedication tract along the north side of the ftiture extension of Riverway <br />Avenue (by others). Because the proposed buildings fronting to Cotter Avenue and Riverway <br />Avenue are to be located as close as possible to the property line, the existing 70-foot drainage <br />and public utility easement (per plat), adjacent these streets, is proposed to be reduced. The <br />existing roadside drainage channels will be enclosed with storm sewer culverts and sized to <br />adequately convey the 100 -year flood. This storm sewer culvert design will be provided with the <br />project civil sitework engineering design, after PDD approval. Public utility easement <br />requirements will also be re-evaluated at that time. As a pre-requisite to re-plat approval, a <br />Public Improvements Construction Plan Permit application will be made for the above-described <br />enclosed storm sewer culverts. <br />V. Proposed Re-Zoning <br />The proposed revised base zoning is MF-24:Multi-Family Residential District. The proposed <br />land use is to be amended to High Density Residential. <br />VI. Concept Plan <br />Refer to Figure 3 for the Concept Plan. Proposed site development improvements include one <br />(1) Clubhouse building with swimming pool, seven (7) 3-story apartment buildings, one (1) <br />maintenance building and associated parking and utilities. No buildings or surface parking are <br />proposed within the FEMA-approved Letter of Map Revision (LOMR) Floodway, Surface <br />parking may be provided within the 100 -year floodplain. Finish grades for the parking and drive <br />areas within the 100-year floodplain will be established at or below the existing ground grades. <br />These parking areas and drives will be constructed with pervious pavers. <br />Wrought iron fencing will be installed along the rear and north side property lines. Pedestrian <br />access points with gates along the rear property line will be provided for the residents and their <br />visitors to and from the Blanco River greenbelt. Privacy or wrought iron fencing for the <br />individual unit patios is planned. Gated entries with turnarounds for vehicle access will be <br />provided for security purposes, with connecting fencing to adjacent buildings. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.