Laserfiche WebLink
a) Obtain copies of available aerial photos, and mapping covering the proposed route. <br />b) Obtain available as -built street, water, sanitary sewer and storm drain plans from the <br />OWNER. <br />c) OWNER will provide City of San Marcos standard details. FNI will prepare a list of City of <br />San Marcos details that are anticipated on the project and provide a list of City of Austin <br />details needed to supplement the City's standard details. <br />4. Hydraulic Modeling: <br />a) Obtain and Review Data: Obtain and review information from the OWNER including <br />wastewater system GIS, survey and parcel data, the existing hydraulic model, and existing and <br />projected flows for the project area. Obtain and review flow date from Texas State University. <br />b) Construct a Sub -basin Model: Construct a hydraulic model to include existing wastewater lines <br />within the sub -basin of the proposed replacement projects. FNI will utilize the OWNER's GIS <br />to build the geometry and assign attribute data. Flows will be allocated to the model based on <br />existing and projected flow data provided by the OWNER. <br />c) Perform Hydraulic Analysis: Evaluate the sub -basin under existing and future flow conditions to <br />determine appropriate sizing of replacement lines. Downstream impacts to the wastewater <br />system will be identified. <br />d) Review storm water design by Brown and GaEngineers: Coordinate with Brown and Gay to <br />review storm water plans. <br />5. Develop Preliminary Engineering Report (PER): Prepare a Preliminary Engineering Report that <br />includes: <br />a) Determine project permitting and design requirements. <br />b) An analysis of replacement methods including pipe bursting and open cut, and the recommended <br />pipe sizes for each segment to be replaced based on the hydraulic model. <br />c) Determine alignments including possible utility conflicts and easement acquisition. <br />d) Schematic design of project using available aerial photography. <br />e) Proposed construction phasing and sequencing for the project. <br />f) Documentation of the wastewater model construction and hydraulic analysis. <br />g) Preliminary opinion of probable construction cost (OPCC). <br />FNI will provide a "Draft" engineering report for the OWNER to review. FNI will attend PER <br />workshop with the OWNER and finalize the PER incorporating all necessary corrections and <br />revisions resulting from the workshop. <br />6. Phase Deliverables: <br />a) Monthly status reports. <br />b) Draft PER: Two (2) hard copies and one (1) electronic copy in PDF format. <br />c) Final PER: Two (2) hard copies and one (1) electronic copy in PDF format. <br />d) One (1) electronic copy of hydraulic model. <br />e) Furnish to the OWNER an updated written opinion of probable construction costs for the <br />Project. <br />B. 60% DESIGN PHASE: FNI shall provide professional services in this phase as follows: <br />1. Meetings: <br />a) 60% Design Workshop: Meeting to discuss comments made on the 60% design submittal. <br />Prepare meeting agenda and minutes. <br />b) ivionthiy P-rogress iviecting: (i) additionai meeting to discuss the project progress. <br />