My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-155
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2012 4:21:10 PM
Creation date
12/27/2011 3:03:55 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2011-155
Date
12/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Storm Water Pollution Prevention Plan: Develop erosion control drawings to be used in the <br />Storm Water Pollution Prevention Plan. <br />4. Phase Deliverables: <br />f) Monthly status reports. <br />g) 90% Design Plans: Two (2) hard copies in 11x17 (half -size) format and one (1) electronic copy <br />in PDF format. <br />h) Design Specifications: One (1) hard copy and one (1) electronic copy in PDF format at 90% <br />Design only. <br />i) Design Plans and Specifications for the storm sewer layout sheet by Brown and Gay Engineers <br />included in the Master Project Contract Document set. <br />j) Updated written opinion of probable construction costs for the project. <br />D. 100% DESIGN PHASE: <br />1. 100% Design Construction Plans and Specifications: <br />a) Prepare design plan and profile sheets, details and specifications incorporating OWNER <br />comments from previous submittal. <br />Upon receiving comments from the 100% submittal, ENGINEER will incorporate all comments and <br />develop the Bid Documents. <br />2. Phase Deliverables: <br />a) Monthly status reports. <br />b) 100% Design Plans and Specifications: One (1) electronic copy in PDF format. <br />c) Design Plans and Specifications for the storm sewer layout sheet by Brown and Gay Engineers <br />included in the Master Project Contract Document set. <br />d) Updated written opinion of probable construction costs for the project. <br />E. BID OR NEGOTIATION PHASE. Upon completion of the design services and approval of 100% <br />drawings and specifications by OWNER, FNI will proceed with the performance of services in this <br />phase as follows: <br />1. Meetings: <br />a) Prebid Meeting: Assist the OWNER in conducting a pre -bid conference for the construction <br />project and coordinate responses with OWNER. Response to the pre -bid conference will be in <br />the form of addenda issued after the conference. <br />2. Bid Phase Services: <br />a) Assist Owner by responding to questions and interpreting bid documents. Prepare and issue <br />addenda to the bid documents to plan holders if necessary. <br />b) Tabulate and analyzing the bids received. Review the qualification information provided by the <br />apparent low bidder to determine if, based on the information available, they appear to be <br />qualified to construct the project. <br />c) Recommend award of contracts or other actions as appropriate to be taken by OWNER. <br />3. Phase Deliverables: <br />a) Provide OWNER a CD with bid plans and specifications in PDF format. <br />
The URL can be used to link to this page
Your browser does not support the video tag.