Laserfiche WebLink
c) Prepare documentation for contract modifications required to implement modifications in the <br />design of the project unless there is a change in project scope. Project design changes due to a <br />change in project scope will be an additional service. <br />d) Notify Owner of Contractor's non - conforming work observed on site visits. Review quality <br />related documents provided by the contractor such as test reports, equipment installation reports <br />or other documentation required by the Construction Contract Documents. <br />e) Interpret the drawings and specifications for OWNER and Contractor. Investigations, analyses, <br />and studies requested by the Contractor and approved by OWNER, for substitutions of <br />equipment and /or materials or deviations from the drawings and specifications is an additional <br />service. <br />f) Prepare and deliver up to three (3) exhibits to be used by OWNER for modification requests to <br />the Contract Documents of this Project. <br />g) Revise the construction drawings in accordance with the information furnished by construction <br />Contractor(s) reflecting changes in the Project made during construction. Two (2) sets of prints <br />of "Record Drawings" shall be provided by FNI to OWNER. <br />3. Phase Deliverables: <br />a) Monthly status reports. <br />b) Project site visit memos and construction progress meeting minutes. <br />c) Project Record Drawings: <br />1. Two (2) sets of full size plans. <br />2. CD with Record Drawings in PDF Format, project survey files, project CAD files in <br />AutoCad and Microstation formats and shapefiles in GIS format if needed. <br />d) Shop Drawing Submittal Log <br />ADDITIONAL SERVICES: Additional Services to be performed by FNI, if authorized by OWNER, which are <br />not included in the above described basic services, are described as follows: <br />A. Subsurface utility explorations (SUE). <br />B. Substitutions of materials or equipment or design modifications requested by the OWNER. <br />C. Construction staking. <br />D. GIS mapping services or assistance with these services. <br />E. Providing services to investigate existing conditions or facilities, or to make measured drawings thereof, <br />or to verify the accuracy of drawings or other information furnished by OWNER. <br />F. Providing renderings, model, and mock -ups requested by the OWNER. <br />G. Making revisions to drawings, specifications or other documents when such revisions are 1) not <br />consistent with approvals or instructions previously given by OWNER or 2) due to other causes not <br />solely within the control of FNI. <br />H. Providing consultation concerning the replacement of any Work damaged by fire or other cause during <br />the construction, and providing services as may be required in connection with the replacement of such <br />Work. <br />Investigations involving consideration of operation, maintenance and overhead expenses, and the <br />preparation of rate schedules, earnings and expense statements, feasibility studies, appraisals, <br />evaluations, assessment schedules, and material audits or inventories required for certification of force <br />account construction performed by OWNER. <br />