My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-214
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2006 9:56:28 AM
Creation date
7/26/2006 9:50:57 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-214
Date
12/6/2004
Volume Book
159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />~ <br /> <br />2.1 Provide full information to the Contractor regarding the City's requirements for the <br />Contractor's goods and services under this Agreement. The City will furnish the Contractor with <br />copies of official City policies and procedures, and other data and information in the City's <br />possession needed by the Contractor at the Contractor's request. <br /> <br />2.2 Designate Laurie Anderson as the City's Project Manager and authorized representative <br />to act on the City's behalf with respect to this Agreement. The City will examine the documents <br />and information submitted by the Contractor and promptly render responses to the Contractor on <br />issues requiring a decision by the City. <br /> <br />2.3 Provide access to and make all necessary provisions for the Contractor to enter public and <br />private property as required for the Contractor to perform its services under this Agreement. <br /> <br />2.4 Provide the concrete pads and utility connections required for the Contractor to install the <br />Equipment as follows: <br /> <br />a) Wastewater Treatment Plant: <br />1) Power <br />2) Instantaneous Water Supply <br />3) Nutrients <br /> <br />480/60/TBD <br />80 gpm @ 45 psi <br />Plant effluent <br /> <br />b) Remote Locations: <br />1) Power <br />2) Instantaneous Water Supply <br /> <br />480/60/20 <br />25 gpm @ 45 psi <br /> <br />2.5 Require approximately six (6) months from the date of this agreement to design and <br />award a construction contract to provide the facilities described in 2.4 above. <br /> <br />2.6 Allow Bioway, upon completion of installation and with seven days notification to the <br />City, to begin a sixty day period of continuous operation as required in Article 3.1.4. If Bioway <br />cannot begin this continuous operation period because of circumstances under the control of the <br />City or its contractors the sixty day period will be reduced by the same number of days as the <br />delay. <br /> <br />2.7 Bear all costs incident to this Article. <br /> <br />ARTICLE 3 <br />PAYMENTS TO THE CONTRACTOR <br /> <br />3.1 PAYMENTS ON ACCOUNT OF BASIC SERVICES <br /> <br />Payments for Basic Services will be made to Contractor following the satisfactory completion of <br />each activity as listed in the table in Section 11.2 of this Agreement for each of the four units <br />listed in that table, and receipt by the City of Contractor's invoices and appropriate payment <br />requisitions. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.