<br />I <br /> <br />I <br /> <br />1.3.11 The Project Architect will provide assistance to the Owner Representative in the review <br />of the Contractor's requests for change orders and pricing thereof. <br /> <br />1.3.12 The Project Architect will prepare necessary change orders in triplicate originals for <br />approval by the City, through the Owner Representative, and execution in accordance with the <br />Contract Documents, and will, with the Owner Representative's approval, have authority to <br />prepare minor changes in the Work not involving an adjustment in the Contract Sum or an <br />extension of the Contract Time, which are not inconsistent with the intent of the Contract <br />Documents and which do not affect the validity of performance bond(s). In conjunction with <br />each Change, the Project Architect will review the cost and time estimate and recommend to the <br />City whether the proposal is appropriate. The Project Architect will prepare revised Contract <br />Drawings, where appropriate, to illustrate and document the work required by the Change. <br />Project Architect will not issue change orders not previously approved in writing by City, <br />through the Owner Representative" and no course of conduct on the part of Project Architect, <br />Contractor, City or Owner Representative will amend, waive or alter this provision. <br /> <br />1.3.13 All proposed changes to drawings, plans and specifications, regardless of how initiated, <br />will be fully described in the document depicting them as to scope of work added, removed, or <br />changed. The original copies of the Contract Documents may be revised to show such changes, <br />provided that all such revisions will be separately recorded on media acceptable to City, <br />including, without limitation, CADD. Such revisions will be clearly indicated and a current <br />revision date will be included on the reproducible copy. Changes to the specifications will be <br />made by consecutively numbered and dated revision addenda. All changes to design documents <br />or specifications will be identified by date of change, revision number and other customary <br />identification references. Areas changed on drawings will be "clouded" to show each change. <br />Clouds designating previous changes will be removed so that only the most recent changes will <br />be clouded. <br /> <br />1.3.14 The Project Architect will participate in concealed space inspections and systems start-up <br />inspections as well as conduct professional inspections to determine the dates of substantial <br />completion and final completion for the Project, to evaluate the work for acceptable conformance <br />with the Contract Documents and in light of any subsequent tests performed as described herein <br />to verify that any minor deviations from the Contract Documents as described herein have been <br />corrected and that the reasons for any specific qualifications in any and all previous certificates <br />for payment as described herein are either no longer valid or the condition(s) and/or problem(s) <br />have been corrected. The Project Architect will issue final certificates for payment or take other <br />appropriate action; and will make a written recommendation to the City regarding City's <br />acceptance of the Project. <br /> <br />1.3.15 The Project Architect will receive and review written guarantees and warranties and <br />related documents required by the Contract Documents and assembled by the Contractor for <br />conformance with the Contract Documents. Prior to the end of the one year warranty period, <br />review the completed Project with the City and the Contractor and prepare a list of all deficient <br />items for correction by the Contractor. <br /> <br />I 1.3.16 The Project Architect will assist the City in checking as-built drawings provided by the <br />14 <br />