Laserfiche WebLink
San Marcos Wastewater Masterplan <br />PBS&J <br />Austin, Texas <br />February 6, 2003 <br /> <br />The velocity/depth and/or lift station meters will be utilized in the gravity sewer lines and/or lift <br />stations, which is programmable from 1-minute to 60-minute interval. Under normal flow <br />conditions, the flow meter is programmed to obtain readings at 15-minute intervals. <br /> <br />The compensation for this task will be on "Per Each" basis. <br /> <br />Task 4 - Project Administration and Management, Supervision & QA/QC <br /> <br />This task consists of supervision of field personnel, project administration and management, <br />scheduling of field tasks, general management and supervision of field personnel, and quality <br />assurance/control of field work and data management activities. Additionally, it will include: <br /> <br />1. Conduct general administration and periodic meetings as necessary with ENGINEER. <br /> <br />2. Perform internal project control procedures on a monthly basis including schedule, budget, <br /> quality control review and invoices. <br /> <br />3. Review of the engineering evaluation of the flow monitoring data and reporting functions. <br /> <br />The compensation for this task will be on a "Per Lump Sum" basis. <br /> <br />Task 5- Relocation of Flow Monitoring Equipment (Optional) <br /> <br />This task consists of the relocation of flow monitoring equipment and development of additional <br />wastewater flow parameters based on the requirements of the ENGINEER. The ENGINEER <br />desires to have a facility by which flow monitoring equipment can be relocated to other portion of <br />the collection system during the initial 60-day flow monitoring period. This task is included to <br />compensate for additional site investigations, removal, reinstallation, and recalibration of the flow <br />monitors and the additional engineering and data management associated with each relocated <br />flow monitor. This is an optional task that will be exercised at the ENGINEER'S discretion. <br /> <br />The compensation for this task will be on "PerEach" basis for each relocated flow monitor. <br /> <br />2.0 COMPENSATION FOP, SERVICES AND TERMS OF PAYMENT <br /> <br />The total price to cover all services described under the Scope of Work is Ninety Four Thousand <br />Nine Hundred ($94,900.00). This figure does not include any optional tasks, invoices will be <br />rendered monthly and computed based on the unit prices shown in Table 1 and quantities of work <br />completed as authorized by the ENGINEER including the lump sum tasks amounts being <br />established by percent of completion. Tasks listed as "per each" or "Meter-Day." are estimated~ <br />Quantities found in field investigation may vary and will be performed and charged by the unit <br />price shown in Table 1 in an amount not to exceed the total proposal cost. Work on these items <br />exceeding the total proposal cost will not be performed without prior authorization by the <br />ENGINEER. <br /> <br />Table 1 provided with this proposal delineates the unit price or lump sum price for each task. <br /> <br />3,0 INFORMATION AND SERVICES TO BE PROVIDED BY THE ENGINEER AND/OR OWNER. <br /> <br />The ENGINEER and/or City of San Marcos shall provide the following information and services: <br /> <br />/I Engineering/San Marcos/Flow Monitoring Proposal.doc <br /> <br /> <br />