My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1980-015
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1980
>
Res 1980-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2008 10:38:42 AM
Creation date
8/16/2006 2:53:05 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1980-15
Date
2/25/1980
Volume Book
52
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />, <br /> <br />APPENDIX A <br />FEE SCHEDULE - SIGNAL CONSTRUCTION PROJECT <br /> <br />Payment for services as described in this Agreement shall be made to the Engi- <br />neer as determined by the following schedule: <br /> <br />Cost of Construction <br /> <br />Basic Minimum Fee in Percent <br /> <br />7.00~ <br />7.00 <br /> <br />$50,001 - $100,000 <br />100,000 - 250,000 <br /> <br />Forthepurpose of establishing fees for separate phases, the following percentage <br />allocations for the minimum scheduled fees apply: <br /> <br />Phase <br /> <br />Percentage of Total Fee <br /> <br />Preliminary Phase <br /> <br />20 <br /> <br />Design Phase <br /> <br />50 <br /> <br />Construction Phase <br /> <br />30 <br /> <br />A. <br /> <br />Method of Payment <br /> <br />Payment shall be made to the Consultant based upon the several phases <br />as described heretofore and in accordance with the following: <br /> <br />1. Preliminary Phase - the total amount due the Consultant for com- <br />pletion of the Preliminary Phase shall be payable after approval <br />and acceptance of this phase by the City. <br /> <br />2. Design Phase - the total amount due the Consultant for completion <br />of the Design Phase shall be payable after approval and acceptance <br />of this phase by the City. <br /> <br />3. Construction Phase - Payment will be made following final Project <br />inspection and delivery of revised contract drawings showing work <br />as actually constructed. <br /> <br />4. It is to be understood that although the amount paid the Consultant <br />as that portion of his fee due for the Preliminary Phase and Design <br />Phase may be based upon his estimate of the cost of the construction <br />project, this fee will be adjusted to conform to the fee due the Con- <br />sultant based upon the actual award of the construction contract <br />and its total amount. Any additions, modifications, or alterations <br />made to the construction project after its award will be considered <br />in the total cost of the project and the Consultant shall be paid <br />based upon this actual total cost of the project, and any adjustments <br />necessary in partial payment of his total fee will be corrected to <br />agree with the final cost of the project. <br /> <br />5. Should the City elect to modify or delete portions or segments of <br />this project after award of the construction contract has been made, <br />then appropriate adjustment will be made based upon the revised con- <br />struction contract cost. However, the Consultant shall be paid for <br />the Preliminary and Design Phase for the segment or portion deleted <br />from the project on the basis of the lowest bid received on this seg- <br />ment or portion of the construction project whether or not the con- <br />tractor submitting the low bid was awarded the contract. <br /> <br />6. Should the Consultant develop the Preliminary Phase and Design Phase <br />of the project and the City elects to abandon or cancel the project <br />for any reason, the Consultant shall be paid for the proportionate <br />part of the Preliminary and Design Phase completed by the Consultant <br />based upon the estimated construction cost of the project as approved <br />by the City. This payment shall constitute full and final payment to <br />the Consultant for the work performed by him in development of these <br />phases of the proposed project as described heretofore. Otherwise <br />payment shall be made as stated above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.