Laserfiche WebLink
<br />I <br /> <br />a. City Wide Fire Service !-2-~~~~nd Site Selection Assistance: <br />The Engineer shall be compensated a lump sum of $5660 for services <br />described in 2.a. above. <br /> <br />b. Basic Services: The Engineer shall be compensated at nine and <br />one half percent (9.5%) of the construction cost of the project. <br />Should the construction cost be less than the targeted $250,000, <br />the percentage fee will be higher based on a straight line inter- <br />polation between 9.5% (for $250,000) and 10.5% for a $100,000 <br />construction cost. Should the construction cost be less than <br />$100,000, the fee will be determined by a straight line projection <br />based on the above figures. <br /> <br />In a determination of the total construction cost of the <br />work on which the Engineer's Basic Services fee shall be <br />based, there shall not be included the cost of land, <br />rights-of-way, administrative or legal expenses, architect, <br />engineering, and special consultant fees, services of testing <br />laboratories, boring or foundation tests, or any other items <br />not relating to the work, involving the direct construction <br />cost, which the Engineer administers. Also there shall not <br />be deducted from the construction cost sums withheld from <br />payments to Contractors, such as penalties, liquidated <br />damages or other similar sums. <br /> <br />I <br /> <br />In the event that the Owner does not award a contract, the fee <br />due will be based on the percent of work accomplished and the <br />latest estimate furnished the Owner by the Engineer and accepted <br />by the Owner. <br /> <br />c. Additional Services: The Engineer shall be compensated for <br />Additional Services on a standard cost plus basis in accordance with <br />the following schedule of charges. No work under this section will <br />be performed without the specific authorization of the Owner. <br /> <br />Cost Multiplier Basis: <br />(1) Staff Members - Salary Cost Times Multiplier of 2.3 <br /> <br />Salary Cost is defined as the cost of salaries of engineers, <br />architects, planners, draftsmen, stenographers, surveymen, <br />clerks, laborers, etc., for time directly chargeable to <br />the project, plus social security contributions, unemployment <br />compensation insurance, retirement benefits, medical and <br />insurance benefits, sick leave, ~acation and holiday pay <br />applicable thereto. (Salary Cost is currently equal to <br />1.35 times salary payments. This factor is adjusted <br />annually.) <br /> <br />(2) Schedule of Salaries <br /> <br />I <br /> <br />Classification <br /> <br />Hourly Rate <br /> <br />Project Di rector <br />Project Architect <br />Project Engineer <br />Engineer <br />Archi tect <br /> <br />$ 16.00 <br />$ 1 5 . 00 <br />$ 11. 00 <br />$ 1 0 . 00 <br />$ 7.00 <br />