My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1980-059
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1980
>
Res 1980-059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2008 10:38:57 AM
Creation date
8/18/2006 2:21:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1980-59
Date
8/25/1980
Volume Book
53
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />Classification <br /> <br />Hourly Rate <br /> <br />Drafter <br />Secretary/Clerical <br /> <br />$ 6.00 <br />$ 5.50 <br /> <br />The above salary classifications are based on current <br />salary rates and must be adjusted as salary costs are <br />increased. The above rates will be honored, however, <br />for work accomplished through February 1981. <br /> <br />(3) Other Direct Expense - Actual Cost Times Multiplier of 1.15 <br /> <br />Other direct expenses shall include printing and repro- <br />duction expense, communication expense, travel, trans- <br />portation and subsistence away from Austin, and other <br />miscellaneous expense directly related to work, including <br />other work required to be done by independent persons or <br />agents other than staff members. <br /> <br />6. Time of Compensation: Payment for services rendered by the Engineer <br />shall be made as follows: <br /> <br />a. The Engineer may submit requests for partial payment based on ' <br />the amount of work completed; however, only ninety percent (90%) of <br />the total fee for anyone phase or segment of the work shall be due <br />prior to the completion of the phase or segment of the work. <br /> <br />b. In addition to the above, with respect to the Basic Services <br />portion of the work, (1 .b.), the following percentages of the total <br />fee shall be payable upon completion of each phase: <br /> <br />Schematic Design Phase: <br />Design Development Phase: <br />Construction Documents Phase: <br />Bidding or Negotiation Phase: <br />Construction Phase: <br /> <br />Fifteen percent <br />Twenty percent <br />Fifty percent <br />Five percent <br />Ten percent <br /> <br />(15%) <br />(20%) <br />~50%~ <br />5~ <br />~ <br /> <br />(10%) <br /> <br />7. Preliminary Estimates: When requested to do so, the Engineer will <br />furnish estimates of probable construction cost of the work, but he does not <br />guarantee the accuracy of such estimates. <br /> <br />8. Revisions of Plans and Specifications: The Owner reserves the right <br />to direct substantial revision of the plans and specifications after due approval <br />by the Owner as Owner may deem necessary, but in such event the Owner shall pay <br />to the Engineer just and equitable compensation for services rendered in making <br />such revisions. If revisions in the plans, specifications or drawings are <br />required by reason of the Engineer's error or omission, then such revisions <br />will be made by the Engineer without additional compensation to the fees herein <br />specified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.