My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09031980 Emergency Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1980 s
>
1980
>
09031980 Emergency Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2008 10:33:03 AM
Creation date
8/18/2006 3:00:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Emergency Meeting
Date
9/3/1980
Volume Book
53
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />124 <br /> <br />August 14, 1980 <br /> <br />SIMON W FREESE, P.E. <br />JAMES R. NICHOLS, P.E. <br />ROBERT L. NICHOLS, P.E. <br />LEE B. FREESE, P.E. <br />ROBERT S. GOOCH, P E. <br />JOE PAUL JONES, P.E. <br />ROBERT A. THOMPSON III, P E. <br /> <br />JOE B. MAPES, P.E. <br />OCIE C. ALLEN, P E. <br />W ERNEST CLEMENT, P.E. <br />ELVIN C. COPELAND, P. E. <br />JOHN H. COOK, P.E. <br />T ANTHONY REID, P.E. <br />GARY N. REEVES, P.E. <br /> <br />GEORGE HUMAN, P.E. <br />MANAGER - AUSTIN <br /> <br />FREESE AND NICHOLS. INC. <br /> <br />CONSULTING ENGINEERS <br />FORT WORTH AUSTIN <br /> <br />I <br /> <br />Mr. A. C. Gonzalez <br />City Manager <br />City of San Marcos <br />630 E. Hopkins <br />San Marcos, Texas 78666 <br /> <br />Re: Bid Analysis <br />Industrial Park Water Storage <br />and Pumping Station <br /> <br />Dea r A. C.: <br /> <br />The following bids were received on the above referenced project Monday, <br />August 4, 1980: <br /> <br /> 1 ) J.K.W. Construction $109,873.00 <br /> 2) Psencik Construction Co. $111 ,844. 00 <br /> 3) Austin Engineering Co. $118,600.00 <br /> 4) Du-Mor Enterprises $121,083.25 <br /> 5) Hogan Mechanical $121,331.00 <br /> 6) R. B. Butl er, Inc. $125,000.00 <br />I 7) Bryan Construction Company $135,900.00 <br />8) MSA General Construction $145,000.00 <br /> <br />As requested, we have analyzed the three low bids and have prepared a <br />draft letter for your review to return the bid bonds of the other five <br />bidders in accordance with Paragraph 3 of the Information for Bidders. <br /> <br />You will note that there is a difference of $1,971.00 between the apparent <br />low bid and the second apparent low bidder, which is approximately a 1.8% <br />difference, and there is a difference of $8,727.00 between the apparent low <br />bid and the third apparent low bidder. In addition to the bid price, we <br />believe that there are other factors which should be considered by the City <br />in evaluating the bids for contract award. These factors include but are <br />not limited to experience in similar projects, how long the contractor has <br />been in business, manpower availability, equipment availability and comments <br />from both municipalities and engineers concerning previous projects. <br /> <br />It is recognized that the total construction cost includes both the con- <br />tractor's bid price and construction costs such as testing and inspection. <br />It is further recognized that those latter costs generally increase as <br />problems with the progress of construction increase. <br /> <br />512/451.7955 ONE HIGHLAND CENTER SUITE 560 314 HIGHLAND MALL BLVD. AUSTIN, TEXAS 78752 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.