My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1980-068
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1980
>
Res 1980-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2008 10:39:13 AM
Creation date
8/21/2006 10:17:27 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1980-66
Date
9/22/1980
Volume Book
54
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SA <br /> <br />CONTRACT FOR <br /> <br />ENGINEERING SERVICES <br /> <br />I <br /> <br />STATE OF TEXAS <br />COUNTY OF HAYS <br /> <br />Thi s Contract entered into thi s 23rd day of September , <br />1980, bj and between the City of SAN MARCOS, TEXAS, hereinafter called <br />the Owner, acting by and through A. C. Gonzalez, its City Manager, duly <br />authori zed to act. and FREESE AN>O NICHOLS, IrlC., of Austi n, Texas, Regi sterp.1 <br />Professional Engineers, hereinafter called the Engineer. <br /> <br />Witnesseth, that in consideration of the covenants and agreements <br />herein contained, the parties hereto do mutually agree as follows: <br /> <br />1. Employment of Engineer: The Owner hereby employs the Engineer <br />and the Engineer agrees to perform professional engineering services <br />hereinafter set forth in connection with certain improvements to streets <br />and drainage in the Mill Street area, shown as Attachment A, and here- <br />inafter called the Project. <br /> <br />2. Character and Extent of Services: The Engineer shall render <br />engineering services which include the following: <br /> <br />I <br /> <br />a. Preliminary Engineering: <br /> <br />1 ) <br /> <br />Review existing reports, maps, plats and other <br />information that may be provided by the Owner. <br /> <br />2) Attend conferences with the Owner and other In- <br />terested parties regarding the Project. <br /> <br />3) Prepare engineering studies and information on the <br />Project and propose alternative solutions including <br />estimated costs of alternatives. <br /> <br />4) Meet with the Owner and present findings and make <br />recommendations for improvements, then prepare final <br />report. Ten (10) copies of the final report will be <br />provided to the Owner. <br /> <br />5) The final report shall be completed for submittal <br />to the City Council within eighty-five (85) days of <br />authorization to proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.