My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1980-068
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1980
>
Res 1980-068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2008 10:39:13 AM
Creation date
8/21/2006 10:17:27 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1980-66
Date
9/22/1980
Volume Book
54
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />Classification <br /> <br />Range <br /> <br />Project Manager <br />Project Engineer <br />Assistant Project Engineer <br />Technicians <br />Secretary <br /> <br />15.00 - <br />14.00 - <br />11 .00 - <br />3.75 - <br />5.00 - <br /> <br />20.00 <br />15.00 <br />11 .80 <br />8.90 <br />6.20 <br /> <br />The above salary classifications are based on current <br />salary rates and must be adjusted as salary costs are <br />increased. The above rates will be honored, however, <br />through February, 1981. <br /> <br />b. <br /> <br />For Surveys, Designs, Plans and Specifications: For <br />Surveys, Designs, Plans and Specifications, the Engineer <br />shall be compensated for basic services (referred to <br />hereinafter as Basic Charge) plus surveying. Compen- <br />sation for Basic Charge shall be determined from the <br />curve shown as Attachment C, using actual construction <br />cost of the work which is authorized at the same time. <br />The fee for Basic Charge shall be divided into two <br />parts - (1) Design, Plans and Specifications (Paragraph <br />2.b.) and (2) General Representation (Paragraph 2.c.). <br />The fee for Design, Plans and Specifications shall be <br />85% of the Basic Charge on Attachment C. <br /> <br />Ninety (90%) percent of the 85% of the Basic Charge <br />shall become due and payable upon submittal of Plans <br />and Specifications to the Owner. If a construction <br />contract is not awarded within ninety days following <br />submittal of Plans and Specifications to the Owner, <br />full compensation (85 percent of Basic Charge) shall be <br />paid to the Engineer. This fee shall be based upon an <br />estimated construction cost agreed upon by the Owner and <br />Engineer. <br /> <br />For surveying, the Engineer shall be compensated on the <br />basis of the normal schedule of charges in effect at the <br />time surveying services are authorized for each segment <br />of the proj ect. <br /> <br />The Engineer agrees that the maximum hourly rate for <br />a 3~person survey party including standard equipment <br />will not exceed $49.50 for work completed prior to <br />December 31, 1981, without specific authorization. <br /> <br />c. For General Representation and Observation During Con- <br />struction: For General Representation and Observation <br />During Construction, the Engineer shall be compensated <br />on the basis of Charges for Design shown as Attachlllent <br />C. The total compensation for Design, Plans and Specifi- <br />cations and General Representation During Construction, <br /> <br />5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.