Laserfiche WebLink
<br />I <br /> <br />B. After acceptance by City of the preliminary design <br />documents and opinion of probable Improvements Cost, <br />indicating any specific modifications or changes in <br />scope desired by City, and upon written authorization <br />from City, Enqineer shall proceed with the performance <br />of the services called for in the Final Design Phase, <br />so as to deliver Contract Documents and a revised <br />opinion of probable Improvements Cost for all authorized <br />work on the Improvements within 90 calendar days after <br />the authorization to proceed with that phase of services. <br /> <br />C. After acceptance by City of the contract drawings and <br />Engineer's most recent opinion of probable Improvements <br />Cost and upon written authorization to proceed, Engineer <br />shall proceed with performance of the services called for <br />in the Bidding Phase. This Phase shall terminate and <br />the services to be rendered thereunder shall be considered <br />complete upon commencement of the Construction Phase. <br /> <br />D. The Construction Phase will commence with execution of <br />the contract and will terminate upon written approval <br />by Engineer of final payment to the contractor(s). <br /> <br />E. Failure of Engineer to meet the time requirements <br />imposed by sections A-D of this article shall be <br />grounds for immediate termination of this agreement <br />by City. <br /> <br />ARTICLE V <br />cm1PENSATION <br /> <br />I <br /> <br />A. The basic services described in Atricle II shall be paid <br />for on the basis of percentage of the construction cost <br />of the project using the curve shown as Attachment A. <br />The percentage will be taken from the lowest reliable <br />acceptable bid. <br /> <br />l) Upon delivery of the preliminary design the Engineer <br />shall be oaid 30% of the total compensation due for <br />basic services, plus all compensation due for additional <br />services rendered and reimbursable expenses incurred <br />to that date. <br /> <br />2) Upon delivery of the final design the Engineer shall <br />be paid an amount such that this amount plus the <br />previous payment for basic services shall total 70% <br />of the total compensation due for basic services, plus <br />all compensation due for additional services rendered <br />and reimbursable expenses incurred to that date. <br /> <br />3) Upon award of the contract the Engineer shall be paid <br />an amount such that this amount plus the previous <br />payment for basic services shall total 85% of the <br />total compensation due for basic services, plus all <br />compensation due for additional services rendered <br />and reiffioursaole expenses incurred to that date. <br /> <br />I <br /> <br />4) During the construction phase, the Engineer I may submit <br />monthly invoices based on the percentage of the <br />contractor's completion of the project and for <br />additional services accomplished during the billing <br />per~od. Upon completion of the construction phase, <br />the Engineer shall be paid the balance of the com- <br />pensation due for basic services plus all compensation <br />due for additional services rendered and reimbursable <br />expenses incurred to that date. <br /> <br />5 <br />