My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2012-015
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2012
>
Ord 2012-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2014 1:42:19 PM
Creation date
4/6/2012 3:40:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
2012-15
Date
4/3/2012
Volume Book
194
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SAN MARCOS ELECTRIC RULES AND REGULATIONS <br />excess construction cost payment by the customer. <br />B. COMMERCIAL SERVICE <br />The city will construct an overhead primary line extension to provide permanent service <br />to a commercial facility requiring full time service at the regular established rates and <br />minimum monthly charges under the following conditions: <br />1. GENERAL SERVICE AND SMALL COMMERCIAL <br />a. A standard overhead line extension of up to 1200 feet for single phase <br />service or 400 feet for three phase service, will be provided for General <br />Service and Small Commercial customers requiring full time service to <br />shops, stores, offices and other similar facilities. Non - standard <br />installations and extensions in excess of the above stated footage will <br />only be made if the customer pays the additional cost incident thereto. <br />b. Electric service will be provided to water wells, barns, signs and other <br />non - residential locations from the city's existing primary lines. In <br />situations where the extension of primary facilities is required, the <br />applicant will he required to pay the estimated cost in advance for <br />constructing the extension. <br />2. LARGE COMMERCIAL- The City will extend standard overhead lines to <br />provide service to a Large Commercial customer requiring full time electric <br />service up to 1200 feet for single phase service or for 400 feet for three phase <br />service. <br />The customer may be required to pay the cost for those situations where the line <br />extension exceeds the length allowed. However, each new Large Commercial <br />facility will be evaluated to determine if the anticipated annual revenues will <br />provide the necessary margins to permit a longer extension. <br />3 . EXCESS CONSTRUCTION COST DETERMINATION- In the situation <br />where a line extension for electric service exceeds the maximum length provided <br />as a standard by the city, the customer will be required to pay the City, in advance <br />of any construction of the extension, an amount to be determined as follows: <br />The required length of the extension shall be established by a field survey <br />performed by the City. The total length of the extension will be reduced by the <br />maximum allowed for the type of service to obtain the excess construction <br />required stated in feet. The number of feet of excess construction will then be <br />multiplied by the city's Standard Construction Costs for the type of extension <br />required to obtain the amount of the required payment. <br />Where it can be demonstrated that the expected annual revenues (derived from <br />base rates , exclusive of fuel) to be paid by the prospective customer will generate <br />the required margins to cover the total cost of constructing the extension, <br />disregarding any allowance, the city may, at its option, extend service without an <br />excess construction cost payment by the customer. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.