My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-138
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2006 9:31:04 AM
Creation date
8/23/2006 9:30:17 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1999-138
Date
7/12/1999
Volume Book
137
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Attachment A <br /> <br />Page 4 <br /> <br />IV. CONSTRUCTION PHASE <br /> <br />The following tasks are to be provided: <br /> <br />1. Assist in preconstruction conference. Attend periodic construction meetings. <br />2. Review shop drawings. <br />3. Visit construction site periodically, at approximate average of twice per week. <br />4. Interpret drawings and specifications. <br />5. Observe construction for general conformity to contract documents (not full- <br />time representation). <br />6. Review and process contractor's monthly pay applications. <br />7. Prepare final punch list. <br />8. Upon satisfactory completion of the work by the contractor, issue Engineer's <br />concurrence for final acceptance by the City. <br /> <br />Please note that any needed materials testing services by PSI (geotechnical <br />consultant) will be considered an additional service. In the alternative, the City <br />could directly contract with PSI for this work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.