My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-042
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2006 4:13:30 PM
Creation date
9/11/2006 4:11:48 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-42
Date
2/23/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l. Natural and cultural resources information. <br />m. Floodplain information. <br />n. National Wetland Inventory Map(s). <br />o. Endangered and threatened species infonnation. <br />p. Existing zoning and land use infonnation. <br />q. Hydrological data. <br />3. Transfer existing City electronic data computer fJles of topographic mapping and <br />planimetric features along proposed sewer pipeline alignment to F& N computer <br />system and plot work maps. <br />4. Perform preliminary conceptual design of the following: <br />a. Define proposed service areas and their wastewater contributions to the <br />proposed wastewater system improvements. <br />b. Defme service period for wastewater system improvements. <br />c. Determine minimum and maximum wastewater flow rates for duration of <br />service period. Review and consider recommendations contained in the <br />SSES performed by ADS. <br />d. Perform preliminary sizing of gravity lines and force mains based upon the <br />determined flow rates. <br />e. Perform preliminary layout of one (1) lift station. <br />f. Perform preliminary layout of wastewater pipeline alignment between the <br />Gary Job Corps Center"s wastewater treatment plant and the City"s existing <br />wastewater gravity main. Perform feasibility study of the alignment <br />including design, construction cost, easement. and permit requirements. <br />g. Pen~Jrm a feasibility study of up to two (2) alternate lift station locations <br />including design, construction cost, access, power, easement and permit <br />requirements. <br />h. Establish final design criteria for gravity line, force main and lift station. <br />). Determine a preliminary opinion of probable cost for the pipeline alignment and lift <br />station location in Task A.4, including: <br /> <br />r OFl'Q'I)<~ S~t""RCSOW DOC <br /> <br />2 <br /> <br />IOij I (I":' <br />
The URL can be used to link to this page
Your browser does not support the video tag.