My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-042
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2006 4:13:30 PM
Creation date
9/11/2006 4:11:48 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-42
Date
2/23/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8. Attend one (1) meeting in San Marcos to discuss the results of the Phase I study and <br />to receive City of San Marcos and DOL comments. This task includes preparation, <br />travel, participation and responding to comments from the meeting. <br />9. Attend up to two (2) progress meetings at City office. <br />10. City will provide: <br />a. Copies of available project data and reports. <br />b. Available topographic mapping on compu~er diskettes. <br />c. City design criteria. <br />d. Coordination of meetings with land owners and progress meeting. <br />e. Estimation of value of wastewater service associated with land acquisition <br />and easements. <br />f. Identification of project service areas. <br />g. Identification of City preferential alternate pipeline alignments and lift station <br />locations for F& N study and subsequent selection of final alignment based <br />on analysis and recommendations provided by F&N. <br />h. Identification of locations of future service connections. <br />1. Land and easement acquisition. <br /> <br />B. PHASE II FINAL DESIGN AND BID ASSISTANCE <br /> <br />Upon the City's written authorization to proceed with Phase II Final Design and Bid <br />Assistance, F&N will: <br /> <br />O. <br />1. <br /> <br />Perform Project Management and coordination of activities. <br />Attend up to tive (5) design progress meetings at City office. <br />Perform site visits to gather design information in combination with item 1 above, <br />whenever possible. <br />Provide on-site design surveys and geotechnical investigation. <br />Provide on-site easement, surveys, easement description, and plats. <br />Attend up to four (4) meetings v.ith lando\\'T1ers including: <br />a) City Parks and Recreation Dept., b) Gary Job Corps Center, c) Railroad, and d) <br /> <br />, <br /> <br />'" <br />.J. <br /> <br />4. <br /> <br />). <br /> <br />4 <br /> <br />TOfH70l'l' S~IARCSO\li lXlC <br /> <br />10<1: ~1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.