Laserfiche WebLink
<br />8. Attend one (1) meeting in San Marcos to discuss the results of the Phase I study and <br />to receive City of San Marcos and DOL comments. This task includes preparation, <br />travel, participation and responding to comments from the meeting. <br />9. Attend up to two (2) progress meetings at City office. <br />10. City will provide: <br />a. Copies of available project data and reports. <br />b. Available topographic mapping on compu~er diskettes. <br />c. City design criteria. <br />d. Coordination of meetings with land owners and progress meeting. <br />e. Estimation of value of wastewater service associated with land acquisition <br />and easements. <br />f. Identification of project service areas. <br />g. Identification of City preferential alternate pipeline alignments and lift station <br />locations for F& N study and subsequent selection of final alignment based <br />on analysis and recommendations provided by F&N. <br />h. Identification of locations of future service connections. <br />1. Land and easement acquisition. <br /> <br />B. PHASE II FINAL DESIGN AND BID ASSISTANCE <br /> <br />Upon the City's written authorization to proceed with Phase II Final Design and Bid <br />Assistance, F&N will: <br /> <br />O. <br />1. <br /> <br />Perform Project Management and coordination of activities. <br />Attend up to tive (5) design progress meetings at City office. <br />Perform site visits to gather design information in combination with item 1 above, <br />whenever possible. <br />Provide on-site design surveys and geotechnical investigation. <br />Provide on-site easement, surveys, easement description, and plats. <br />Attend up to four (4) meetings v.ith lando\\'T1ers including: <br />a) City Parks and Recreation Dept., b) Gary Job Corps Center, c) Railroad, and d) <br /> <br />, <br /> <br />'" <br />.J. <br /> <br />4. <br /> <br />). <br /> <br />4 <br /> <br />TOfH70l'l' S~IARCSO\li lXlC <br /> <br />10<1: ~1 <br />