My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-042
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2006 4:13:30 PM
Creation date
9/11/2006 4:11:48 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-42
Date
2/23/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TXDOT. These meetings to b~ combined with it~ms 1 and 2 abo\~ whenever <br />possible. <br />6. a. Prepare final design and layout of the wastewater system improvements <br />recommended in Task A.7; under the following assumptions: a) <br />approximately 19,100 linear feet of wastewater pipeline, b) approximately <br />9,600 linear feet of gravity line, c) one (I} wastewater pipeline alignment, d) <br />one (1) package lift station, e) one (1) force main pipeline material and one <br />gravity pipeline material, f) one (1) lift station location, g) service <br />connections consisting of one (1) connection to the City's existing gravity <br />main, one (1) connection to the proposed raw water treatment plant. and one <br />(1) connection to the Quail Creek CountIy Club including selection of <br />package lift station and force main (in lieu of easement purchase), and <br />approximately seven (7) connections to the Gary Job Corps Center. <br />b. Provide criteria and coordination of on-site geotechnical field investigation <br />and laboratory testing. <br />7. Prepare approximately 19 detailed sheets of drawings of the wastewater system <br />improvements designed in Task B.6 to be constructed. Prepare the drawings in <br />Microstation 95, using F&N's standard details and layouts. Plan and profile sheets <br />for force main and gravity line to be doubled on each sheet. <br />8. Prepare detailed technical specifications of the wastewater system improvements <br />designed in Task B.6 to be constructed. Prepare the technical specifications using <br />F&N's standard master specifications. Prepare the bid documents, contract <br />documents, and general conditions using Citys standard documents as developed for <br />current WWClP improvements. <br />9. Prepare a final opinion of probable construction cost of the improvements designed <br />in Task B.6 to be constructed. <br />10. Submit permit applications for construction to: <br />a) TNRCC, b) Railroad, and c) TXDOT, d) Corps of Engineers (nationwide 404 <br />permit), e) Texas General Land Office grant of easement (if Blanco River is State <br />Owned). and f) Environmental Protection Agency (NPDES Baseline General <br /> <br />T Of'Fq~Q'O'. SMAIlCSOW DOC <br /> <br />5 <br /> <br />111)3 q; <br />
The URL can be used to link to this page
Your browser does not support the video tag.