Laserfiche WebLink
<br />I <br /> <br />criteria. Drawings will include cover sheets, plan and profiles, standard details, <br />traffic control, tree protection and erosion protection plans. Waterline <br />improvements will extend from intersection of proposed FM3407 and Hunter <br />Road to terminus ofFM 3407 at railroad overpass. <br /> <br />11. <br /> <br />Facilitate City permit coordination and application approval. <br /> <br />111. <br /> <br />Prepare City standard specifications for construction of waterline. <br /> <br />IV. <br /> <br />Prepare estimation of construction cost for waterline design. <br /> <br />K. Sanitary Sewer Line Desie:n <br /> <br />1. Prepare final sanitary sewer line design drawings according to recommendations <br />from Preliminary Design Report. Drawings to include cover sheets, plan and <br />profiles, tie-in and lateral details, standard details, traffic control, tree protection <br />and erosion protection plans. Sanitary sewer line improvements will extend from <br />intersection of proposed FM 3407 and Hunter Road to terminus ofFM 3407 at <br />railroad overpass. <br /> <br /> 11. <br />I 111. <br /> IV. <br /> v. <br /> <br />Design will be in accordance with standard City and TCEQ sanitary sewer line <br />design criteria. <br /> <br />Facilitate City permit coordination and application approval. <br /> <br />Prepare City standard specifications for construction of sanitary sewer line. <br /> <br />Prepare estimation of construction cost for sewer line design. <br /> <br />L. General Notes/Specifications/Standards/Certifications <br /> <br />1. Provide required general notes, specification data and special provisions. <br /> <br />11. Prepare any additional special provisions or special specifications, as required. <br /> <br />111. Select standard TxDOT drawings applicable to the project, modify as required, <br />and fill in title blocks. <br /> <br />IV. Provide certification letters for Utility Adjustment, Relocation and Advisory <br />Assistance, Right-of-Way Encroachment and Right-of-Way Acquisition. <br /> <br />M. Estimated Quanitities/Cost Estimate/Construction Time Estimate <br /> <br />I <br /> <br />1. <br /> <br />Prepare list of construction bid items. <br /> <br />13 <br />