My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-080
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2007 1:41:48 PM
Creation date
4/16/2007 11:28:07 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-80
Date
4/27/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> EXHIBIT A <br /> EASTSIDE INTERCEPTOR PHASE II & LH. 3S RELIEF SEWER EXTENSION <br /> SCOPE OF SERVICES <br /> 1. Preliminary Design Phase <br /> A. Perfonn site visits to the future lift station and proposed pipeline alignment locations to <br /> obtain first-hand knowledge of these sites. <br /> B. Obtain the following information from the City: <br /> (1) The CCN boundary <br /> (2) The City limits and ETJ boundaries <br /> (3) The wastewater service area boundary <br /> (4) City's 1995 Wastewater Master Plan (TC&B has already acquired a copy) <br /> (5) Previous master plan project known as the Cottonwood Creek Interceptor <br /> (TC&B has already acquired a copy) <br /> (6) Proposed development of landowners around the Centerpoint Road and <br /> Cottonwood Creek area. <br /> (7) Electronic fIle of two-foot contour maps along the proposed pipeline alignment <br /> (8) Utility maps and/or record drawings of existing utilities in the project area. <br /> C. Define the proposed service areas, develop wastewater flow contributions based on the <br /> City's 1995 Wastewater Master Plan, and define service periods for the following <br /> alternatives: <br /> (1) Alternative No.1 - Development in accordance with the City's 1995 <br /> Wastewater Master Plan. <br /> (2) Alternative No.2 - Development in accordance with the City's 1995 <br /> Wastewater Master Plan with the addition of the previous master plan project <br /> known as the Cottonwood Creek Interceptor. <br /> D. Meet with the City to conflI1Il the development plans, service areas, service periods, <br /> and design parameters to be used in the development of the wastewater flow <br /> contributions for each alternative previously defined. <br /> E. Perfonn preliminary utility research to identify potential conflicts and assignments for <br /> proposed facilities. <br /> F. Upon acceptance of the development plans, service areas, service periods, and design <br /> parameters, defme the minimum and maximum flow rates through the wastewater lines, <br /> size the lines based on the abandonment of the existing lift station and force main, and <br /> prepare a preliminary engineer's estimate of probable construction cost for each <br /> alternative. Separate preliminary cost estimates will be provided for the gravity main <br /> and lift station designated on Exhibit No.1 as '"by others". <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.