Laserfiche WebLink
<br /> Antonio Street. <br /> (e) Perform additional topographic survey of the side streets of San <br /> Antonio and Hopkins for approximately 50 feet beyond the <br /> intersections with LB.J. <br /> Guadalupe Street - Phase III <br /> (f) Receive the computer file for the existing topographic survey of <br /> Guadalupe Street. Enlarge the scale to 1 " = 3' and edit the data to <br /> show points of field elevation. <br /> (g) Field check the data prepared and supplement topographic data to <br /> the center line of the street and provide additional elevations at <br /> entrances to the buildings to assist in determining grades at the <br /> buildings. <br /> (h) Tie the curb across the street adjacent to the Court House if it is <br /> constructed during this work. Extend the topographic survey for <br /> Guadalupe Street for approximated 50 feet south of the intersection <br /> with San Antonio Street. <br /> (I) Perform additional topographic survey of the side streets of San <br /> Antonio and Hopkins for approximately 50 feet beyond the <br /> intersections with Guadalupe. <br /> Hopkins Street - Phase IV <br /> 0> Perform field topographic survey along the north side of Hopkins <br /> Street extending from Guadalupe Street to LBJ Drive and extending <br /> 50 teet beyond each intersection. The topographic features will <br /> include visible improvements between the center line of Hopkins <br /> Street to the faces and entrances to the buildings. In addition, data <br /> will be accumulated along the side streets north of Hopkins to reach <br /> approximately 50 feet beyond the intersection. The south curb line <br /> along Hopkins Street adjacent to the Court House will be field tied if <br /> it is constructed at the time of the field work. Prepare a computer <br /> drawing at a scale of 1 " = 3'. <br /> TASK 2 - DESIGN SERVICES <br /> The Consultant will: <br /> 1.3.1 Meet with the City's Project Manager periodically or as needed to update the City <br /> on the progress ot work. <br /> 1.3.2 Head the Project team and coordinate the integration of design, surveying, right of <br /> way issues, traffic control, utility engineering, ADA compliance, permitting, and other <br /> 4 <br />