Laserfiche WebLink
C. Tbe Contractor will keep all equipment clean and ia a good state of repair. <br /> <br />D. The Contractor will not allow the noise level for tbe collection vebicles during the stationary <br /> compaction process to exceed 75 decibels at a distance of 25 feet from the collection vehicle and at <br /> aa elevation of five feet from the horizontal base plane of the vebicle. <br /> <br />E. The Contractor will identify its vebicles and other equipmeat with the name, address, and pbone <br /> number of the Contractor's local office on each of its passenger doors so that the information is <br /> clearly readable from a distance of I00 feet. <br /> <br />F. Tile Contractor will provide access at any time for the City to inspect the equipment to ensnre that <br /> ail equipment meets the requirements of this Contract and has the proper TXDOT certification. <br /> <br />1.4.5 Personnel <br />A. The Contractor will provide capable drivers with current class "C" drivers licenses. <br /> <br />B. Tbe Coatractor will ensure that all of its employees, permanent or temporary, present a neat <br /> appearance and can be easily recognized while performing work under this contract. All of its <br /> employees will wear appropriate identification badges or uniforms. <br /> <br />C. The Contractor will ensure that any persons employed who are aot United States citizens will have <br /> valid work permits. <br /> <br />D. The Contractor will remove f¥om service under this Contract and replace any of its employees for just <br /> cause as requested by the City. <br /> <br />Section 1.5 Disposal of Recyclable Materials and Solid Waste <br /> <br /> 1.5.1 Disposal <br /> <br />The Contractor will baul and dispose of, or will arrange for the hauling and disposal of, all recyclable <br />materials and solid waste collected by it at a recyclable materials processing facility or a solid waste disposal <br />site licensed by the State of Texas for tbat purpose. The Contractor will make every reasonable effort to <br />dispose of recyclable materials at a recyclable materials processing facility rather than at a solid waste <br />disposal site. Tbe processing facility and disposal site will have adequate capacity to accommodate the <br />requirements of this Coatract. Any costs of disposal, including without limitation, tipping, drop-off, <br />processing or other fees charged for processing or disposal are included in tbe fees set forth in this Contract. <br /> <br /> 1.5.2 Ownersbip of Collected Rec¥clable Materials <br /> <br />Tile Contractor accepts title to all recyclable materials placed in the Contractor's collection vehicles, or <br />received by the Contractor at the recycling center. The City does not accept ownership or title to any such <br />items. <br /> <br />Page 4 <br /> <br /> <br />