My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-078
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2007 2:57:08 PM
Creation date
5/3/2007 5:13:02 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-78
Date
5/1/2007
Volume Book
171
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />D) <br /> <br />V AP/ROI Analysis <br /> <br />I) Determine/evaluate workflow benefits; <br />2) Determine first pass cash flow benefits; <br />3) Develop an asset utilization program; <br />4) Identify cost reductions; <br />5) Assess the safety/environmental impact(s); <br />6) Perform a client satisfaction review; and <br />7) Meter replacement savings. <br /> <br />1.2.2 Perform procurement planning wherein the Consultant will: <br /> <br /> A) <br /> B) <br /> C) <br /> D) <br /> E) <br /> F) <br />I G) <br />H) <br />I) <br /> J) <br /> K) <br /> L) <br /> M) <br /> N) <br /> 0) <br /> P) <br /> Q) <br /> R) <br /> S) <br /> T) <br /> U) <br /> V) <br /> W) <br /> X) <br /> <br />Develop a procurement strategy and evaluation procedure. <br />Develop a Request for Proposals based on standard City forms and procedures, <br />and in accordance with State law for the City's use in selecting potential AMR <br />vendors. <br />Assist the City in evaluating proposals including a detailed review of <br />proposals. <br />Assess features/demonstrations. <br />Perform field Experience, data backhaul, register/encoder, software and billing- <br />CIS compatibility review. <br />Perform proponent review/hold point. <br />Perform ancillary component review. <br />Perform meter review. <br />Check fittings, accessories. <br />Perform recalibration checks (retrofit job). <br />Review connection of AMR elements. <br />Perform installation review. <br />Review bonding, license requirements. <br />Assess internal personnel utilization. <br />Perform facility and security review. <br />Develop customer notification plan. <br />Review installation procedure. <br />Define final commissioning and customer acceptance. <br />Develop a data integrity plan (Transition in Billing/CIS). <br />Review SCADA Connectivity. <br />Review remote site management and access. <br />Review system maintenance and warranty requirements. <br />Perform final Owner/Engineer Cost Review in order to assist the City in final <br />AMR contract negotiations. <br />Provide written recommendation for award of contract to successful proponent. <br /> <br />1.2.3 Manage the AMR Project for the Implementation Phase wherein the Consultant will: <br /> <br />I <br /> <br />A) <br />B) <br /> <br />Manage the Project Plan developed in 1.2.4; <br />Perform a work flow analysis based upon the new meter reading data; <br /> <br />Automated Meter Reading Contract <br /> <br />Page 3 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.