My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-078
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2007 2:57:08 PM
Creation date
5/3/2007 5:13:02 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-78
Date
5/1/2007
Volume Book
171
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C) <br />D) <br />E) <br />F) <br />G) <br /> <br />Execute the communications plan in conjunction with the City; <br />Provide Project approvals and procedure review; <br />Provide Project management and inspection; <br />Integrate the AMR system; and <br />Develop and provide a training program. <br /> <br />1.2.4 Create a Detailed Project Plan for the entire AMR Project wherein the Consultant will: <br /> <br />A) Identify resources, timelines, and task details for City review; <br />B) Provide text of goals and group discussions for inclusion in a project narrative; <br />C) Provide a network implementation plan; <br />D) Provide a meter installation plan; <br />E) Develop an internal communication plan; and <br />F) Develop an external communications plan. to include customer education and <br />scheduling. <br /> <br />1.2.5 The Consultant will make suggestions regarding the work flow within City departments <br />to ensure that the City receives the maximum benefit from an AMR system wherein the <br />Consultant will: <br /> <br />A) <br />B) <br />C) <br />D) <br /> <br />Develop IT specification(s) for data management; <br />Recommend new data point capture for Water and Electric Production; <br />Map out projected integration issues; and <br />Complete integration and workflow design of the AMR system. <br /> <br />1.2.6 Provide Project Management wherein the Consultant will: <br /> <br />A) Perform all network design and implementation oversight; <br />B) Coordinate all routing, scheduling, and planning activities (suppliers, <br />installers and City staff); <br />C) Certify Implementation Phase performance; <br />D) Develop a Project Plan and modify as necessary; <br />E) Conduct (Monthly Senior Staff Meetings) and modify the project plan as <br />required; <br />F) Conduct weekly Project Team meetings; <br />G) Monitor billing notification; and dispute resolution; <br />H) Monitor all system performance for daily acceptance; and <br />I) Provide weekly progress reports and updates to the City. <br /> <br />1.2.7 Oversee system integration between the AMR vendor and the City's Customer Utility <br />Billing provider, Harris Computers, Inc. to include: <br /> <br />A) <br />B) <br />C) <br /> <br />Perform Daily System Integration Tests; <br />Monitor AMR and CIS Data Flow; and <br />Review Overall System Performance, Data Capture, Alarms, Backups, etc. <br /> <br />Automated Meter Reading Contract <br /> <br />Page 4 of 14 <br /> <br />I <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.