<br />, , <br />, <br /> - I >'{ II- <br /> G. A 1,000,000 gallon welded steel baffled clearwell. <br /> H. Four 1,000,000 gallon earthen sludge holding ponds. <br /> I. Two 500,000 gallon earthen washwater recovery ponds. <br /> J. Necessary yard piping and valves. <br /> K. Necessary site grading. <br /> L. Entrance road and culvert bridge. The CITY will select from <br /> ENGINEER's preliminary designs and projected costs for facilities to <br /> provide access to the Plant site during 10, 25, 50 and 100 year design <br /> storms. <br />! M. Necessary electrical, instrumentation, and controls including <br /> integration of existing SCADA elements with the Plant <br /> computerization and instrumentation. <br /> N. One septic system for on-site generated waste. Should the Gary Job <br /> Corps Center wastewater lift station construction coincide with <br /> completion of the Plant, the CITY may direct that this task be modified <br /> to eliminate the septic tank in favor of gravity sewer mains to the lift <br /> station. <br /> 1.3.5 Prepare detailed plans, specifications, contract documents, designs and layouts for <br /> constructing approximately 9,400 LF. of a 36 inch and 24 inch diameter transmission <br /> main (the "Plant Transmission Main") to connect the Plant to the CITY's distribution <br /> system, for changing Westover Addition to the lower pressure plane,- for changing North <br /> Street to the upper pressure plane, and for installing two pressure reducing valves with <br /> vaults to reduce the pressures in Tanglewood as described in the ENGINEER's Water <br /> Distribution System Analysis, Technical Memorandum No.9. <br /> 1.3.6 Prepare specifications and contract documents and incorporate detailed plans <br /> previously prepared by the CITY for the Spring Lake Transmission Main included in the <br /> Capital Improvements Program to allow the Project to be bid with the Treated Water <br /> Transmission Main. The CITY will seal the plans for the Spring Lake Transmission Main. <br />! Any major modifications or any changes in routing required of the ENGINEER to bid the <br />! Spring Lake Transmission Main will be accomplished as an Additional Service. <br /> 1.3.7 Prepare detailed plans, specifications, contract documents, designs and layouts for <br /> a 0.5 MG welded steel elevated storage tank at the Comanche pump station site. <br /> Modifications to the existing well pumps to allow them to pump directly into the new <br /> elevated storage tank and the installation of one additional booster pump are to be bid as <br /> part of the Surface Water Treatment Plant Project. <br /> 1.3.8 Review front end documents provided by the Program Manager and verify <br /> consistency between plans and technical specifications with bid documents for each <br /> construction contract. <br /> 1.3.9 Establish the scope of any archaeological investigations and reports which are <br /> required for the Project in the opinion of the ENGINEER, and assist the CITY in arranging <br /> 2 <br />