Laserfiche WebLink
<br />, {)'16 <br /> - <br /> for such work to be completed on the CITY's account. <br /> 1.3.10 Provide a raw water sampling and jar testing program as outlined in the February <br /> 26, 1997 letter from the ENGINEER. <br /> 1.3.11 Attend monthly progress meetings commencing the month following the preliminary <br /> meeting and continuing through award of the construction contracts. <br />--- 1.3.12 Conduct three (3) Project workshops to be conducted concurrent with the monthly <br /> meetings. <br /> 1.3.13 Prepare preliminary quantity estimates and preliminary opinions of probable <br /> construction cost at the 50%, 70% and 95% completion milestones in the project Design <br /> for each construction contract. <br /> 1.3.14 Provide ten review copies of plans and technical specifications at the 50%, 70% and <br /> 95% completion milestones. Provide ten final review copies of plans and technical <br /> specifications. <br /> 1.3.15 Attend value engineering meetings when the Design is 70% complete. Respond <br /> to VE recommendations. <br /> 1.3.16 Conduct Quality Control (QC) workshops utilizing senior staff members with <br /> experience acceptable to the CITY. QC workshops are to be held at approximately 50% <br /> and 95% complete milestones. <br /> 1.3.17 Provide one reproducible set of final plans and technical specifications for each <br /> construction project to the Program Manager for advertisement. <br /> 1.3.18 Assist prospective bidders in interpreting construction plans and specifications, <br /> including preparing any necessary addenda. <br /> 1.3.19 Furnish such information necessary to utility companies whose facilities may be <br /> affected or whose services may be required for the Project. <br /> 1.3.20 Prepare and submit a disinfection CT study and obtain approval of the study from <br /> the Texas Natural Resource Conservation Commission. <br /> 1.3.21 Attend pre-bid conferences. <br /> 1.3.22 Review bids and prepare recommendations of award of construction contracts. <br /> 1.3.23 Furnish the CITY with engineering data necessary for applications for routine <br /> permits required by local, state and federal authorities, including general Corps of <br /> Engineers 404 permits. Preparation of supporting documents for government grants or <br /> 3 <br />