My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1996-125
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1996
>
Res 1996-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2007 3:06:47 PM
Creation date
6/14/2007 3:06:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1996-125
Date
7/22/1996
Volume Book
125
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Zg,J <br /> . Document management and distribution. <br /> . Scheduling. <br /> . Cost control. <br /> . Engineering status. <br /> -~- . Contractor progress. <br /> g. Project Progress Reports. Prepare and submit to the Owner <br /> monthly reports on design, cost, and schedule status of the <br /> Project, in a format approved by the Owner. Any significant <br /> changes in Project costs of schedule will be stated, and <br /> recommendations will be made for appropriate action. <br /> B. Technical Review and Consultation. <br /> Review the following deliverables by others in conjunction with the Owner's <br /> review process and report to the Owner on compliance with the Project <br /> standards. List areas of non-compliance. Meet with the Design Engineer and <br /> permit consultants to present specific comments, resolve issues related to <br /> interpretations of non-compliance with the Project requirements and decide <br /> on required modifications. Prepare a final response to the Design Engineer <br /> and permit consultants and review the revised deliverable for conformance <br /> with the agreed upon modifications. <br /> . Preliminary Design Report (plus 5 technical <br /> memorandums) - APAI <br /> . Distribution Analysis - AP AI.. <br /> . Draft construction contract documents (95%). <br /> C. Value Engineering <br /> 1. Initial Review. <br /> a. Assemble design data and cost information from Design Engineer <br /> for use by the value engineering team. <br /> A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.