Laserfiche WebLink
<br /> /2:~:t <br /> (f) Electrical System. Detailed description of the electrical system from <br /> the main substation to the facility's individual motor control centers. <br /> (g) Maintenance. Prepare nameplate data for each piece of major <br /> equipment, list of the manufacturer's recommended spare parts and <br /> compile schedule of equipment manufacturer's preventative <br /> maintenance activities. <br /> ~ (h) Appendices, A glossary of treatment terms and abbreviations used <br /> pertinent to this facility, <br /> - <br /> 1,6,2 Prepare a compilation of the Manufacturer's Maintenance Manuals which will <br /> include a collection of the operation and maintenance manuals supplied by the equipment <br /> manufacturers, The manuals will be reviewed by the ENGINEER for completeness, <br /> 1,6.3 Furnish two copies of the O&M manual to CITY for review and comments at the 90 <br /> percent completion point of the construction work, <br /> 1.6.4 Revise the manual as required and submit two copies to CITY for reference. <br /> 1,6,5 Compare information in the O&M manual with actual operatin9 experience'during <br /> the startup period and revise the manual to correspond with operating experience, Furnish <br /> five copies of the final O&M manual to the CITY, <br /> Startup and Personnel Training <br /> <br /> 1.6.6 Develop and conduct a one-week pre-startup training program for plant supervisors, <br /> operators, maintenance, and laboratory personnel. It is anticipated that training will be <br /> conducted in separate week-long sessions, with each session involving a total of 15 hours <br /> of classroom work, supplemented by onsite "hands-on" training for individuals and groups, <br /> - 1.6,7 Consult with CITY on training needs for post-startup operation and prepare a <br /> schedule. It is anticipated that post startup training will be conducted for one week <br /> involving a total of 15 hours of classroom work, <br /> 1,6,8 Provide 64 hours of onsite operation consultation, including a total of 4 trips to the <br /> site to consult on starting and optimizing biological, chemical, and other process controls, <br /> Establish operating procedures for individual unit processes and for overall plant operation, <br /> 1.6,9 Consult with CITY's personnel concerning a computerized maintenance <br /> management system, Provide 40 hours of onsite consultation, including a total of 2 trips <br /> to the site, <br /> 1,6.10 Provide 64 hours of office time to consult concerning the correction of items relating <br /> to the operations. Advise the CITY and CM regarding correction of operational problems, <br />