Laserfiche WebLink
<br /> IZfl<- <br /> (f) Preparation for litigation, arbitration, or other legal or administrative <br /> proceedings; and appearances in court or at arbitration sessions in <br /> connection with bid protests, change orders, or construction incidents, <br /> (g) Additions to an engineering report to update or revise original <br /> recom m endations. <br /> -"~ (h) Extensive revision of design, drawings, and specifications to <br /> incorporate changes arising from value engineering review. <br /> (i) An environmental assessment as requested by CITY or required by <br /> review agencies, <br /> U) Observing factory tests and/or field testing of equipment that fails to <br /> pass the initial test. <br /> (k) Conducting pilot plant studies and tests, <br /> (I) Visits to the construction site or to CITY's location in excess of the <br /> number of such trips and the associated time set forth in other <br /> Sections 1.2 through 1,6 of this Agreement . <br /> (m) Preparation of a master construction schedule from individual <br /> schedules subm itted by construction contractors, and coordination <br /> and resolution of conflicts with contractor's sèhedules. <br /> (n) Assistance in financially related transactions for the Project, other <br /> than those described in Sections 1.2 through 1.6. <br /> 1 (0) Where field conditions differ from the conditions indicated in <br /> the construction contract documents or soil boring reports, <br /> preparing sketches of construction work for approval by CITY, <br /> to supplement the drawings and specifications as may be <br /> required; and providing redesign or relocation information if <br /> required by underground obstructions, utilities, or other <br /> conditions, <br /> (p) Making extensive, non-routine reVISions to drawings and <br /> specifications made necessary by the acceptance of substitutions <br /> proposed by the Contractor; and extensive, non-routine services for <br /> evaluating and determining the acceptability of substitutions proposed <br /> by the Contractor. <br /> (q) Additional or extended services during construction made necessary <br /> by (1) work damaged by fire or other cause during construction, (2) <br /> _.'~ <br /> : <br />