My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1995-222
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1995
>
Res 1995-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2007 8:24:50 AM
Creation date
6/28/2007 8:24:50 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1995-222
Date
12/11/1995
Volume Book
121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> IZg!3 <br /> communication; present initial work plan and Project schedule, <br /> (b) Monthly progress meetings with the CITY and the CM throughout the <br /> preliminary design and final design phases to review progress and the <br /> exchange of ideas and information, A total of 11 meetings (one <br /> meeting per month) is anticipated, <br /> (c) Four workshops with the CITY and the CM, The sessions will (1) <br /> -,~.~~ identify process and equipment alternatives, (2) allow for a tour of the <br /> I treatment plant facilities to review proposed processes and/or <br /> ¡ equipment, (3) finalize treatment process and equipment selection, <br /> and (4) present 95 percent complete construction contract <br /> documents. <br /> Coordination <br /> .' <br /> 1,2,7 Coordinate preliminary and design phase activities with the CM, This will include <br /> reports, communications, meetings, and information support, <br /> 1.3 BASIC SERVICES PHASE 2 - PRELIMINARY DESIGN <br /> { <br /> Existino Facilities <br /> 1.3.1 Review existing facilities; collect field data and records and review existing plans <br /> and reports. <br /> 1.3.2 Interview operations and maintenance staff at the plant site, <br /> 1.3.3 Obtain and review existing wastewater quality data for the 24 months prior to the <br /> start of the Project. <br /> Process Alternatives <br /> 1,3.4 Identify and evaluate process alternatives for meeting the effluent quality criteria <br /> contained in the new TNRCC permit (5/5/2/1/6.0). This will include evaluation of the <br /> treatment process with and without primary clarifiers; and phosphorous removal by <br /> biological processes and chemical precipitation. <br /> 1,3.5 Prepare opinions of probable construction cost for the alternatives and make a <br /> cost-effectiveness analysis of the alternatives based on the opinions of probable <br /> construction cost, operating and maintenance costs, and other Project costs. <br /> 1,3,6 Prepare recommendations and review with CITY and CM in a workshop, <br />
The URL can be used to link to this page
Your browser does not support the video tag.