Laserfiche WebLink
<br />)ZZC- <br /> <br /> <br />Equipment Alternatives <br /> <br />1,3,7 Identify and discuss major equipment components of the Project. <br /> <br />1,3.8 Prepare opinions of probable construction cost for the alternatives and make a cost- <br />effectiveness analysis of the alternatives based on the opinions of probable construction <br />cost, operating and maintenance costs, and other Project costs, <br /> <br />1.3.9 Prepare recommendations and review with CITY and CM in a workshop, <br /> <br />Main Pumpina Station <br /> <br />1 ,3,10 Identify and evaluate alternatives for the rehabilitation and expansion of the <br />pumping station and force main, This will include evaluation of a new transfer main and <br />onsite pumping ~tation. <br /> <br />1,3,11 Prepare opinions of probable construction cost for the alternatives and make a <br />cost-effectiveness analysis of the alternatives based on the opinions of probable <br />construction cost, operating and maintenance costs, and other Project costs. <br /> <br />1,3,12 Prepare recommendations and review with.-.CITY during a scheduled progress <br />meeting conducted pursuant to Subsection 1,2,6, . <br /> <br />Treatment Plant <br /> <br />1,3,13 Evaluate alternative layouts of plant and develop a preliminary site plan. <br /> <br />1.3.14 Develop a preliminary hydraulic profile, <br /> <br />: 1,3.15 Develop conceptual building and structure floor plans. <br />i <br />I <br />1.3,16 Develop architectural elevation sketches. <br /> <br />1.3.17 Prepare a facilities description, including: <br /> <br />(a) site conditions, including preliminary drainage and foundation <br />requirements; <br /> <br />(b) flow scheme and major process components for liquid processing <br />systems; <br /> <br />(c) SCADA and computerized control systems; <br /> <br />(d) final disposal plan for grit and screenings; <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />{ <br />