My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1995-222
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1995
>
Res 1995-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2007 8:24:50 AM
Creation date
6/28/2007 8:24:50 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1995-222
Date
12/11/1995
Volume Book
121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> IUD <br /> (e) architectural and structural concepts; <br /> (f) HV AC systems; and <br /> (g) odor control facilities for the main pumping station, headworks, <br /> grease and septage facilities, and primary clarifiers, <br /> 1,3.18 Develop basic utilities services concepts, including standby power. <br /> 1.3,19 Evaluate and establish monitoring and control systems for the facilities. <br /> Desian Survevs <br /> 1,3,20 Assist the CITY and CM in engaging a land surveyor to provide the necessary field <br /> design surveys ~o.r the preparation of construction drawings and specifications. These <br /> surveys will determine site topography, contours, critical hydraulic parameters, and critical <br /> tie-ins, <br /> 1.3,21 Assist CITY and CM in engaging aerial photography and mapping services. <br /> Geotechnical Services <br /> .. <br /> 1.3,22 Assist the CITY and CM in engaging qualified geotechnical engineering services <br /> as described in Article 2 including exploratory work, laboratory and field testing, and <br /> professional guidance in tests to be made at test locations based on preliminary drawings <br /> and designs and including professional interpretations of exploratory and test data, <br /> 1,3.23 Submit information to CITY's consultant for preparation of a final geotechnical <br /> evaluation and report considering both design parameters and constructability and as <br /> described under Article 2, after final design has proceeded to the point where structure <br /> locations, excavation depths, foundation loadings, and pipeline routings have been <br /> established. <br /> 1.4 BASIC SERVICES PHASE 3-DESIGN DEVELOPMENT, CONSTRUCTION <br /> CONTRACT DOCUMENTATION AND BIDDING <br /> Design Development <br /> The design phase of the Project will include facilities identified in the Preliminary <br /> Design (Phase 2), In general, these will include the following: headworks; grease and <br /> septage receiving facilities; clarification and sludge pumping (primary and/or secondary), <br /> phosphorous removal; aeration basin and existing basin diffuser replacement; disinfection; <br /> effluent filters; effluent pumping station; outfall modifications, administration building <br /> expansion; plant modifications designed by ENGINEER to meet ADA and OSHA <br /> requirements; and associated odor control, site, HVAC and electrical work, <br />
The URL can be used to link to this page
Your browser does not support the video tag.